Laserfiche WebLink
Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/12/2022 8/12/2022 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 8/10/2022 5:57 PM NIGHTHAWK CONSTRUCTION LLC <br /> Contact Name: NIGHTHAWK CONSTRUCTION LLC <br /> Site Address:2006 OAKES AVE <br /> Phone:4253082330 <br /> e-Mail:nighthawkconstructionllc@gmail.com <br /> (8/12/2022 3:23 PM RFK) <br /> Rough in approval required for electrical. <br /> Provide special inspection for hold downs into existing concrete. <br /> Framing is OK see notes above. Also checked new floor beam for main floor and hold down locations.Obtain mechanical permit,see previous <br /> inspection. <br /> 8/18/2022 8/18/2022 BLDG 08-FRAMING KURT KECK APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 8/16/2022 10:38 AM NIGHTHAWK CONSTRUCTION LLC <br /> already been inspected. Was just needing electrical sign off for framing sign off. Electrical is all signed off and ready for cover. <br /> Contact Name: NIGHTHAWK CONSTRUCTION LLC <br /> Site Address:2006 OAKES AVE <br /> Phone:4253082330 <br /> e-Mail:nighthawkconstructionllc@gmail.com <br /> Approved as noted: <br /> Call for mechanical rough in inspection. <br /> Leave this area open. <br /> 8/23/2022 8/23/2022 BLDG 12- KURT KECK APPROVAL as noted re mechanical <br /> INSULATION <br /> Notes: <br /> 8/17/2022 10:57 PM NIGHTHAWK CONSTRUCTION LLC <br /> Contact Name:NIGHTHAWK CONSTRUCTION LLC <br /> Site Address:2006 OAKES AVE <br /> Phone:4253082330 <br /> e-Mail:nighthawkconstructionllc@gmail.com <br /> (8/23/2022 7:17 AM KMK) <br /> Call for mechanical rough in inspection. <br /> Leave this area open until it has been inspected <br /> (8/23/2022 2:33 PM KMK) <br /> Leave all areas open necessary for mechanical inspector. <br /> Printed:Wednesday,30 November,2022 3 of 5 SUPERION <br />