Laserfiche WebLink
r <br /> MI CHECKLIST MODIFICATION INSPECTION NOTES <br /> REQUIRED REPORT ITEM APPLICABLE BRIEF DESCRIPTION GENERAL <br /> CROWN DOC# <br /> PRE-CONSTRUCTION THE MI IS AN ON-SITE VISUAL AND HANDS-ON INSPECTION OF TOWER MODIFICATIONS INCLUDING A REVIEW OF CONSTRUCTION REPORTS AND <br /> X MI CHECKLIST DRAWING CED-SOW-10007 THIS CHECKLIST SERVES AS A GUIDELINE FOR THE REQUIRED CONSTRUCTION DOCUMENTS AND ADDITIONAL PERTINENT DOCUMENTATION PROVIDED BY THE GENERAL CONTRACTOR(GC),AS WELL AS ANY INSPECTION DOCUMENTS PROVIDED BY <br /> INSPECTIONS FOR THIS MODIFICATION. 3RD PARTY INSPECTORS.THE MI IS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS,NAMELY <br /> ONCE THE PRE-MODIFICATION MAPPING IS COMPLETE AND PRIOR TO FABRICATION,THE CONTRACTOR SHALL THE MODIFICATION DRAWINGS;IN ACCORDANCE WITH APPLICABLE CROWN STANDARDS;AND AS DESIGNED BY THE ENGINEER OF RECORD(EOR). <br /> PROVIDE DETAILED ASSEMBLY DRAWINGS AND/OR SHOP DRAWINGS.THESE INCLUDE,BUT ARE NOT LIMITED NO DOCUMENT,CODE OR POLICY CAN ANTICIPATE EVERY SITUATION THAT MAY ARISE.ACCORDINGLY,THIS CHECKLIST IS INTENDED TO SERVE AS A <br /> TO,A VISUAL LAYOUT OF NEW REINFORCEMENT,EXISTING REINFORCEMENT CONFIGURATION,PORTHOLES, SOURCE OF GUIDING PRINCIPLES IN ESTABLISHING GUIDELINES FOR MODIFICATION INSPECTION. <br /> X EOR APPROVED SHOP DRAWINGS CED-SOW-10007 MOUNTS,STEP PEGS,SAFETY CLIMBS AND ANY OTHER MISCELLANEOUS ITEMS WHICH MAY AFFECT <br /> SUCCESSFUL INSTALLATION OF MODIFICATIONS ON THE TOWER. THESE DRAWINGS SHALL BE SUBMITTED TO THE MI IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF,AND THE <br /> THE EOR FOR APPROVAL.SHOP DRAWINGS SUBMISSION SHALL INCLUDE THE EOR RFI FORM DETAILING ANY MI INSPECTOR DOES NOT TAKE OWNERSHIP OF THE MODIFICATION DESIGN.OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN EFFECTIVENESS <br /> AND INTEGRITY RESIDES WITH THE EOR AT ALL TIMES.THE MI INSPECTOR SHALL INSPECT AND NOTE CONFORMANCE/NONCONFORMANCE AND PROVIDE <br /> CHANGES FROM THE ORIGINAL DESIGN. TO THE CROWN POINT OF CONTACT(CROWN POC)FOR EVALUATION. <br /> A LETTER FROM THE FABRICATOR,STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH ALL MI'S SHALL BE CONDUCTED BY A CROWN APPROVED MI INSPECTOR,WORKING FOR A CROWN APPROVED MI VENDOR. SEE CROWN CED-LST-10173, <br /> • X FABRICATION INSPECTION CED-SOW-10007 INDUSTRY STANDARDS AND THE CONTRACT DOCUMENTS,SHALL BE PROVIDED TO THE MI INSPECTOR FOR "APPROVED MI VENDORS". <br /> INCLUSION IN THE MI REPORT. <br /> CED-SOW-10007 ACWI SHALL INSPECT ALL WELDING PERFORMED ON STRUCTURAL MEMBERS DURING FABRICATION. A TO ENSURE THAT THE REQUIREMENTS OF THE MI ARE MET,IT IS VITAL THAT THE GENERAL CONTRACTOR(GC)AND THE MI INSPECTOR BEGIN <br /> X FABRICATOR CERTIFIED WELD INSPECTION CED-STD-10069 WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. COMMUNICATING AND COORDINATING AS SOON AS A PURCHASE ORDER(PO)IS RECEIVED.IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN <br /> REACHING OUT TO THE OTHER PARTY.IF CONTACT INFORMATION IS NOT KNOWN THE GC AND/OR INSPECTOR SHALL CONTACT THE CROWN POINT OF <br /> X MATERIAL TEST REPORTS(MTR) CED-SOW-10007 MATERIAL TEST REPORTS SHALL BE PROVIDED FOR MATERIAL USED AS REQUIRED PER SECTION 9.3.5 OF CONTACT(CROWN POC). <br /> CED-SOW-10007. MTRS SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br /> CRITICAL SHOP WELDS THAT REQUIRE TESTING ARE NOTED ON THESE CONTRACT DRAWINGS. A CERTIFIED REFER TO CROWN CED-SOW-10007,"MODIFICATION INSPECTION SOW, FURTHER DETAILS AND REQUIREMENTS. <br /> NA FABRICATOR NDE INSPECTION REPORT CED-SOW-10066 NDT INSPECTOR SHALL PERFORM NON-DESTRUCTIVE EXAMINATION AND A REPORT SHALL BE PROVIDED TO <br /> CEO-STD-10069 THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. SERVICE LEVEL COMMITMENT <br /> NA NDE OF MONOPOLE BASE PLATE � ENG-SOW-10033 A NDE OF THE POLE TO BASE PLATE CONNECTION IS REQUIRED AND A WRITTEN REPORT SHALL BE PROVIDED THE FOLLOWING RECOMMENDATIONS AND SUGGESTIONS ARE OFFERED TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF DELIVERING AN MI <br /> TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br /> . REPORT: <br /> X PACKING SLIPS CED-SOW-10007 PACKING/SHIPPING LIST FOR ALL MATERIAL THAT WAS USED DURING THE CONSTRUCTION OF <br /> THE MODIFICATION. • THE GC SHALL PROVIDE A MINIMUM OF 5 BUSINESS DAYS NOTICE,PREFERABLY 10,TO THE MI INSPECTOR AS TO WHEN THE SITE WILL BE READY <br /> FOR THE MI TO BE CONDUCTED. <br /> ADDITIONAL TESTING AND INSPECTIONS: • THE GC AND MI INSPECTOR COORDINATE CLOSELY THROUGHOUT THE ENTIRE PROJECT. <br /> • WHEN POSSIBLE,IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE SIMULTANEOUSLY FOR ANY GUY WIRE TENSIONING OR <br /> NA RE-TENSIONING OPERATIONS. <br /> • WHEN POSSIBLE,IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE DURING THE MI TO HAVE ANY MINOR DEFICIENCIES CORRECTED <br /> CONSTRUCTION DURING THE INITIAL MI. THEREFORE,THE GC MAY CHOOSE TO COORDINATE THE MI CAREFULLY TO ENSURE ALL CONSTRUCTION FACILITIES ARE <br /> AT THEIR DISPOSAL WHEN THE MI INSPECTOR IS ON SITE. <br /> A VISUAL OBSERVATION OF THE EXCAVATION AND REBAR SHALL BE PERFORMED BEFORE PLACING THE <br /> NA FOUNDATION INSPECTIONS CED-SOW-10144 CONCRETE. A VISUAL OBSERVATION OF THE REBAR SHALL BE PERFORMED BEFORE PLACING THE EPDXY.A REQUIRED PHOTOS <br /> SEALED WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br /> NA CONCRETE COMP.STRENGTH AND SLUMP TEST CED-SOW-10144 THE CONCRETE MIX DESIGN,SLUMP TEST,AND COMPRESSIVE STRENGTH TESTS SHALL BE PROVIDED AS BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS,AT A MINIMUM,ARE TO BE TAKEN AND INCLUDED IN THE MI REPORT: <br /> PART OF THE FOUNDATION REPORT. <br /> FOUNDATION SUB-GRADES SHALL BE INSPECTED AND APPROVED BY AN APPROVED FOUNDATION INSPECTOR • PRE-CONSTRUCT ON GENERAL SITE CONDITION <br /> NA EARTHWORK CED-SOW-10144 • PHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION CONSTRUCTION/ERECTION AND INSPECTION <br /> AND RESULTS INCLUDED AS PART OF THE FOUNDATION REPORT. •• RAW MATERIALS <br /> MICROPILES/ROCK ANCHORS SHALL BE INSPECTED BY THE FOUNDATION INSPECTION VENDOR AND SHALL BE •• PHOTOS OF ALL CRITICAL DETAILS <br /> NA MICROPILE/ROCK ANCHOR CED-SOW-10144 INCLUDED AS PART OF THE FOUNDATION INSPECTION REPORT,ADDITIONAL TESTING AND/OR INSPECTION •• FOUNDATION MODIFICATIONS <br /> REQUIREMENTS ARE NOTED IN THESE CONTRACT DOCUMENTS. •• WELD PREPARATION <br /> BOLT INSTALLATION <br /> CED-SOW-10007 POST INSTALLED ANCHOR ROD VERIFICATION SHALL BE PERFORMED IN ACCORDANCE WITH CROWN •• FINAL INSTALLED CONDITION <br /> NA POST-INSTALLED ANCHOR ROD VERIFICATION CED-FRM-10358 REQUIREMENTS AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI ••POST CONSTRUCTION COATING NG REPAIR PHOTOGRAPHS <br /> REPORT. • <br /> •• FINAL INFIELD CONDITION <br /> THE GENERAL CONTRACTOR SHALL PROVIDE DOCUMENTATION TO THE MI INSPECTOR THAT CERTIFIES THAT <br /> NA BASE PLATE GROUT VERIFICATION ENG-STD-10323 THE GROUT WAS REMOVED AND/OR INSTALLED IN ACCORDANCE WITH CROWN REQUIREMENTS FOR PHOTOS OF ELEVATED MODIFICATIONS TAKEN ONLY FROM THE GROUND SHALL BE CONSIDERED INADEQUATE. <br /> INCLUSION IN THE MI REPORT. THIS IS NOT A COMPLETE LIST OF REQUIRED PHOTOS,FOR A COMPLETE LIST OF PHOTOS SEE CROWN DOCUMENT#CEDSOW-10007. <br /> A CROWN APPROVED CERTIFIED WELD INSPECTOR SHALL INSPECT AND TEST FIELD WELDS,FOLLOWING ALL <br /> NA FIELD CERTIFIED WELD INSPECTION CED-SOW-10066 PROCEDURES SPECIFIED IN CROWN STANDARD DOCUMENTS APPLICABLE TO WELD INSPECTIONS.A REPORT <br /> CED-STD-10069 SHALL BE PROVIDED. NDE OF FIELD WELDS SHALL BE PERFORMED AS REQUIRED BY CROWN STANDARDS <br /> AND CONTRACT DOCUMENTS. THE NDE REPORT SHALL BE INCLUDED IN THE CWI REPORT. F <br /> THE GENERAL CONTRACTOR SHALL PROVIDE WRITTEN AND PHOTOGRAPHIC DOCUMENTATION TO THE MI • wL' <br /> X ON-SITE COLD GALVANIZING VERIFICATION ENG-STD-10149 INSPECTOR VERIFYING THAT ANY ON-SITE COLD GALVANIZING WAS APPLIED PER MANUFACTURER <br /> CED-FRM-10358 MORRISON HERSHFIELD <br /> SPECIFICATIONS AND APPLICABLE STANDARDS. <br /> 1455 Lincoln Parkway,Suite 500 <br /> NA TENSION TWIST AND PLUMB CED-PRC-10182 THE GENERAL CONTRACTOR SHALL PROVIDE A REPORT IN ACCORDANCE WITH APPLICABLE STANDARDS Atlanta,GA 30346 <br /> CED-STD-10261 DOCUMENTING TENSION TWIST AND PLUMB. Tel:770-379-8500 Fax:770-379-8501 <br /> NO. DATE DESCRIPTION BY www.monisonhershfield.com <br /> THE GENERAL CONTRACTOR SHALL SUBMIT A LEGIBLE COPY OF THE ORIGINAL DESIGN DRAWINGS EITHER REVISIONS <br /> X GC AS-BUILT DRAWINGS CED-SOW-10007 STATING"INSTALLED AS DESIGNED"OR NOTING ANY CHANGES THAT WERE REQUIRED AND APPROVED BY <br /> THE ENGINEER OF RECORD.EOR/RFI FORMS APPROVING ALL CHANGES SHALL BE SUBMITTED. SITE NAME:MASONIC CENTER <br /> ADDITIONAL TESTING AND INSPECTIONS: BU NUMBER:825709 <br /> NA WO NUMBER:2069806 <br /> POST-CONSTRUCTION SITE ADDRESS: <br /> A LETTER FROM THE GENERAL CONTRACTOR STATING THAT THE WORKMANSHIP WAS PERFORMED IN 220 OLYMPIC BLVD. <br /> CED-SOW-10007 EVERETT,WA 98203 <br /> X CONSTRUCTION COMPLIANCE LETTER CED-FRM-10358 ACCORDANCE WITH INDUSTRY STANDARDS AND THESE CONTRACT DRAWINGS,INCLUDING LISTING SNOHOMISH COUNTY,USA <br /> ADDITIONAL PARTIES TO THE MODIFICATION PROCESS. <br /> NA POST-INSTALLED ANCHOR ROD PULL TESTS CED-PRC-10119 POST-INSTALLED ANCHOR RODS SHALL BE TESTED BY A CROWN APPROVED PULL TEST INSPECTOR AND A - AN "WAN <br /> REPORT SHALL BE PROVIDED INDICATING TESTING RESULTS. OF WA SAT! ENG/QA BY:KP/TH DATE: 03/01/22 <br /> PHOTOGRAPHS SHALL BE SUBMITTED TO THE MI.PHOTOS SHALL DOCUMENT ALL PHASES OF THE 4 <br /> X PHOTOGRAPHS CED-SOW-10007 CONSTRUCTION. THE PHOTOS SHALL BE ORGANIZED IN A MANNER THAT EASILY IDENTIFIES THE EXACT 4� � � p�p� DFT/QA BY:MV/MO DATE: 03/01/22 <br /> LOCATION OF THE PHOTO. CCC��� <br /> THE MI INSPECTOR SHALL VERIFY THE INSTALLATION AND TIGHTNESS 10%OF ALL NON PRE-TENSIONED / <br /> BOLTS INSTALLED AS PART OF THE MODIFICATION.THE MI INSPECTOR SHALL LOOSEN THE NUT AND VERIFY a a APRVD BY: YW DATE: 03/01/22 <br /> NA BOLT HOLE INSTALLATION VERIFICATION REPORT CED-SOW-10007 r W <br /> THE BOLT HOLE SIZE AND CONDITION.THE MI REPORT SHALL CONTAIN THE COMPLETED BOLT INSTALLATION .d <br /> VERIFICATION REPORT,INCLUDING THE SUPPORTING PHOTOGRAPHS. fin., ^413 1�- w MH PROJECT:2200039.03/CN10-497R1 <br /> X PUNCH LIST DEVELOPMENT AND CORRECTION CED-PRC-10283 FINAL PUNCHLIST INDICATING ALL NONCONFORMANCE(S)IDENTIFIED AND THE FINAL RESOLUTION/APPROVAL. Qn `Z AL E l <br /> DOCUMENTATION CED-FRM-10285 Tr... t SCALE:N.T.S. <br /> • X MI INSPECTOR REDLINE OR RECORD DRAWINGS) CED-SOW-10007 THE MI INSPECTOR SHALL OBSERVE AND REPORT ANY DISCREPANCIES BETWEEN THE CONTRACTOR'S <br /> REDLINE DRAWING AND THE ACTUAL COMPLETED INSTALLATION. MODIFICATION <br /> Wally signed by van Wang <br /> ADDITIONAL TESTING AND INSPECTIONS: <br /> Date: <br /> 030721063 °° INSPECTION <br /> NA CHECKLIST <br /> ^\ REV <br /> THE MI CHECKLIST SHALL BE REVIEWED PRIOR TO THE START OF CONSTRUCTION.ALL PARTIES TO THE MODIFICATION SHALL UNDERSTAND CROWN REQUIREMENTS AND INSPECTIONS/DOCUMENTATION THAT ARE APPLICABLE TO THE SCOPE OF WORK THEY ARE S J O <br /> PERFORMING.ERRORS ON THE CHECKLIST DO NOT ABSOLVE THE GC OR MI INSPECTOR FROM PERFORMING/COLLECTING DOCUMENTATION. L /� <br /> (/� 9 <br />