Laserfiche WebLink
a <br /> PORT HOLE NOTES <br /> 1. All surfaces of the port hole rim itself as well as all exterior structural steel areas affected by welding, including weld <br /> metal, shall be galvanized in accordance with ASTM A780. <br /> 2. The following criteria are required for adherence to this standard. <br /> A. Use rim as template for cutting hole in monopole. Care shall be taken to minimize the root opening (AWS tolerances <br /> allow a maximum of 0.19"). <br /> B. Provide minimum 24"clear vertical separation between rim and other openings in monopole.Align ports on same <br /> azimuth as existing ports. <br /> C. Maximum variance of port hole center elevation shall not be greater than 6". <br /> D. Provide 90°minimum radial separation or two times the hole width clear circumferential separation between rim and <br /> adjacent opening in monopole,whichever is greatest. 18-sided pole with 4 ports shall not be allowed. <br /> E. Edge of opening for the exit port must be at least 24"from splice. <br /> F. Grind all edges of cut opening, achieving a bevel angle of 45°and removing the zinc from the weld area plus 1/4". <br /> Ensure all weld areas and surfaces are clean and free of zinc and loose particles.Zinc shall not be allowed to <br /> contaminate the weld. <br /> G. Position the rim as required and securely tack weld. Finish welding the rim with bevel weld and reinforcing fillet weld <br /> size as determined from the design method. <br /> H. Repair with galvanized coating. Both inside and outside should be brush-coated with 2 coats of zinc-rich paint. <br /> Apply in strict accordance with the manufacturer's recommendations. Paint over repaired surfaces to match <br /> monopole. <br /> STRUCTURAL STEEL NOTES <br /> 1. Design, Fabrication, Erection,Alteration and Maintenance shall conform to the following, unless noted otherwise(UNO). <br /> A. TIA-222: Structural standard for antenna supporting structures and antennas <br /> B. TIA-1019-A: Installation, alteration, and maintenance of antenna supporting structures and antennas <br /> C. AISC: Manual of steel construction <br /> 2. All structural elements shall conform to the following requirements, UNO. <br /> A. Structural steel,ASTM A572 grade 65(Fy=65ksi). <br /> B. All bolts,ASTM A325 type 1 galvanized high strength bolts. <br /> C. All nuts,ASTM A563 carbon and alloy steel nuts. <br /> D. All washers,ASTM F436 hardened steel washers. <br /> s lr; <br /> MORRISON HERSHFIELD <br /> 1455 Lincoln Parkway,Suite 500 <br /> 3. Holes shall not be flame cut thru steel unless approved by the engineer of record. Atlanta,GA30346 <br /> Te1:770-379-8500 Fax:770-379-8501 <br /> NO. DATE DESCRIPTION BY www.monisonhershfield.corn <br /> 4. All fasteners shall not be reused. REVISIONS <br /> SITE NAME:MASONIC CENTER <br /> 5. A nut locking device shall be installed on all proposed and/or replaced ASTM A325 bolts. BU NUMBER:825709 <br /> WO NUMBER:2069806 <br /> SITE ADDRESS: <br /> 6. All proposed and/or replaced bolts shall be of sufficient length such that the end of the bolt be at least flush with the face 220 OLYMPIC BLVD. <br /> of the nut. it is notpermitted for the bolt end to be below the face of the nut after tightening is completed. SNOHOMI H OUN3 <br /> g g p SNOHOMISH COUNTY,USA <br /> INN WANG <br /> 7. Hot-dip galvanize all items, UNO. ��OF WA3glv ENG/QABY: KP/TH DATE: 03/01/22 <br /> Galvanize per ASTM A123,ASTM A153/A153M or ASTM A653 G90,as applicable. � � G>, DFT/QA BY: MV/MO DATE: 03/01/22 <br /> 8. For a list of crown approved cold galvanizing compounds, refer to crown ENG-BUL-10149, "Tower protective coatings �r� APRVD BY: YW DATE: 03/01/22 <br /> bulletin". � �Gnf " 1 3. GS �' MH PROJECT:2200039.03/CN10-497R1 <br /> RALV, <br /> 9. After final inspection,all exposed structural steel as the result of this scope of work including welds,field drilled holes, �'' T��H `5 SCALE:N.T.S. <br /> and shaft interiors(where accessible), shall be cleaned and cold galvanizing applied by brush in accordance with crown VVeng ADDITIONAL <br /> ENG-BUL-10149, "tower protective coatings bulletin". photo documentation is required to be submitted to the MI Digitally xYeno5on <br /> Oate:yxll,IAed:W 05W' <br /> inspector. NOTES <br /> DETAIL DRAWINGS SHALL GOVERN REV <br /> OVER ANY VARIANCE FROM THIS SHEET S-4 0 <br /> 1 r7 <br />