Laserfiche WebLink
June 19, 2019 <br /> 76 Ft Monopole Tower Structural Analysis CCI BU No 825709 <br /> Project Number 37519-2662.001.7805, Order 489096, Revision 0 Page 2 J <br /> TABLE OF CONTENTS <br /> 1) INTRODUCTION <br /> 2)ANALYSIS CRITERIA <br /> Table 1 -Proposed Equipment Configuration <br /> Table 2 -Other Considered Equipment <br /> 3)ANALYSIS PROCEDURE <br /> Table 3 -Documents Provided <br /> 3.1)Analysis Method <br /> 3.2)Assumptions <br /> 4)ANALYSIS RESULTS <br /> Table 4 -Section Capacity(Summary) <br /> Table 5—Tower Component Stresses vs. Capacity <br /> 4.1) Recommendations <br /> 5)APPENDIX A <br /> tnxTower Output <br /> 6)APPENDIX B <br /> Base Level Drawing <br /> 7)APPENDIX C <br /> Additional Calculations <br /> tnxTower Report-version 8.0.5.0 <br />