Laserfiche WebLink
Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/17/2022 5/17/2022 BLDG 07-EXTERIOR KURT KECK PARTIAL top 2'at corbels ok to cover only <br /> SHEAR APPROVAL <br /> Notes: <br /> 5/16/2022 9:45 AM HAIDER CONSTRUCTION <br /> Contact Name:HAIDER CONSTRUCTION <br /> Site Address:1630 RUCKER AVE <br /> Phone:4257713515 <br /> e-Mail:RON@HAIDERCONSTRUCTION.COM <br /> (5/17/2022 2:12 PM KMK) <br /> Provide special inspection report for Shear walls and hold downs per plan.Shear nailing with 4"or less spacing falls under special inspection. <br /> 5/26/2022 5/26/2022 BLDG 14-ROOF KURT KECK CANCELLED <br /> NAILING <br /> Notes: <br /> 206-201-4023 <br /> 7/13/2022 7/13/2022 BLDG 07-EXTERIOR KURT KECK PARTIAL Shear wall 6 walls only <br /> SHEAR APPROVAL <br /> Notes: <br /> ron@haiderconstruction.com,206-201-4023 <br /> Rick 206-201-4023 <br /> (7/13/2022 2:48 PM KMK) <br /> Attach special inspection reports for holddowns and all other shear walls to the building permit.Leave these areas open until they are special inspected <br /> and reports are submitted. <br /> 8/8/2022 8/8/2022 BLDG 08-FRAMING KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> ron@haiderconstruction.com,206-201-4023 <br /> Rick 206-201-4023 <br /> (8/8/2022 10:35 AM KMK) <br /> 1.Provide special inspection reports per plan.Send reports to kkeck@everettwa.gov <br /> Include the address and permit number on emails <br /> 2.Fire block as discussed <br /> 3.Complete roof ventilation as discussed <br /> DO NOT INSULATE <br /> Reschedule for framing inspection when ready <br /> Print out hardcopies of special inspection reports to have on site <br /> 8/15/2022 8/15/2022 BLDG 08-FRAMING KURT KECK APPROVAL per special inspection reports <br /> Notes: <br /> Rick 206-201-4023 ron@haiderconstruction.com <br /> (8/12/2022 10:02 AM KMK) <br /> Ok to insulate. <br /> Provide hard copies of special inspection reports at next inspection. <br /> (8/15/2022 11:30 AM KMK) <br /> Note:provide special inspection reports for interior shear wall nailing per plan <br /> Printed: Monday,01 May,2023 3 of 4 _�__,�_„ . SUPERION <br />