Laserfiche WebLink
L..V E R E T T <br /> Permit Inspections <br /> City of Everett <br /> WASHINGTON <br /> Permit Number: E2206-034 Description: ELECTRICAL TO INSTALL(1)MONUMENT SIGN AND(2) <br /> ILLUMINATED <br /> Applied:6/3/2022 Approved:6/23/2022 Site Address:4201 RUCKER AVE <br /> Issued:6/24/2022 Finaled:5/1/2023 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant:FASTSIGNS EVERETT <br /> Parent Permit:S2206-002 Owner:COMMUNITY HEALTH CENTER OF SNO COUNTY <br /> Parent Project: Contractor:APEX SIGN COMPANY LLC <br /> Details: <br /> WALLS SIGNS <br /> ELECTRICAL TO INSTALL(1) MONUMENT SIGN AND(2) ILLUMINATED <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION <br /> 1/27/2023 1/27/2023 (REASON LISA ROMA EXTENSION <br /> REQUIRED) APPROVED <br /> Notes: <br /> From:Duane Steig<duane.steig@fastsigns.com> <br /> Sent:Thursday,January 26,2023 11:33 AM <br /> To:Engineering/Public Services(PW)<evteps@everettwa.gov> <br /> Cc:Harminnie Berger<harminnie.berger@fastsigns.com> <br /> Subject:[EXTERNAL]Expired Sign Permit S2206-002&Electrical Permit E2206-034 <br /> CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you recognize the sender and know the <br /> content is safe. <br /> Hello, <br /> This permit expired last month and was never called in for final inspection after we installed it. <br /> Recently it was hit and destroyed by a car and we removed it. <br /> How can we renew it? We need 1-2 months to make the new sign and then will call in for inspection after it's complete. <br /> Thank you <br /> Duane Steig <br /> Sales Engineer <br /> c:360-572-7225 <br /> FASTSIGNS of Everett,WA <br /> 2902 Rucker Ave Everett,WA 98201 <br /> 4/28/2023 4/28/2023 ELEC 10-FINAL MICHAEL APPRVD-PERMIT <br /> WICKLANDER FINAL <br /> Notes: <br /> 1.-T <br /> Printed: Monday,01 May,2023 1 of 1 SUPERION <br />