My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1011 GRAND AVE 2023-05-22
>
Address Records
>
GRAND AVE
>
1011
>
1011 GRAND AVE 2023-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2023 2:11:05 PM
Creation date
5/22/2023 7:33:48 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1011
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESIDENTIAL PHOTOVOLTAIC PERMIT APPLICATION (Page 2 of 2) <br /> CITY OF EVERETT PERMIT SERVICES <br /> EV E R E T T SUBMITTAL INSTRUCTIONS:Email application to PermitServices@everettwa.gov or drop off at 3200 Cedar Street 2nd Floor Drop Box <br /> WASHINGTON CONTACT INFORMATION:(P)425-257-8810 1(E)PermitServices@everettwa.gov I(1N)everettwa.gov/permits <br /> ELECTRICAL PERMIT CHECKLIST <br /> DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER ELECTRICAL PERMIT: <br /> If you answer yes to all of the below questions, the project qualifies for an over-the-counter electrical permit. YES NO <br /> 1. PV modules, inverters, and combiner boxes are identified for use in PV systems. 9 ❑ <br /> 2. The inverters are listed and laveled in accordance with UL 1741 and are listed for utility interaction. [IRC M2302.4] Q ❑ <br /> 3. The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] 19 ❑ <br /> 4. The system meets all current NEC, City, and Washington Cities Electrical Code requirements. P9 ❑ <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service disconnects. 0 ❑ <br /> 6. Maximum load added to the panel board is vased on the rating of the panelboards bus/main OCPD combination in accordance <br /> with NEC 705.12(D)(2)(3)(b), and is limited to (check the combination below that applies): <br /> ❑225amp bus/200amp main OCPD-13,400AC watts, max. 70amp inverter OCPD. <br /> ❑ 225amp bus/225amp main OCPD-8,640AC watts, max. 45amp inverter OCPD. <br /> ❑200amp bus/200amp main OCPD-7,860AC watts, max. 40amp inverter OCPD. <br /> ❑ 150amp bus/150amp main OCPD-5,760AC watts, max. 30amp inverter OCPD. <br /> ❑ 125amp bus/125amp main OCPD-4,800AC watts, max. 25amp inverter OCPD. <br /> ❑ 125amp bus/100amp main OCPD-9,600AC watts, max. 50amp inverter CCPD. <br /> ❑ 100amp bus/100amp main OCPD-3,840AC watts, max. 20amp inverter OCPD. <br /> 91 Other Electrical Permit with Plan Review Required: <br /> Note 1: Listed un-altered factory main/bus combination.Alteration of the panelboard main OCPD will require plan <br /> review. <br /> Note 2: The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the <br /> maximum currents as calculated in 690.8(A). The rating or setting of overcurrent devices shall be permitted in <br /> accordance with 240.4(B) and (C). [NEC 690.8(B)(1)] <br /> Note 3: If a panelboard employs a snap switch rated 30 amperes or less in any branch circuit, it cannot be rated more <br /> than 200 amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelboard. <br /> This requirement does not apply to panelboards equipped with circuit breakers. Section 408.36(a) of the NEC. <br /> 7. 1 have attached the following Electrical One-Line Diagram: <br /> ❑ Standard Electrical Diagram -6 Strings or Less <br /> ® Standard Electrical Diagram -4 Strings or Less <br /> ®Standard Electrical Diagram -Micro Inverter <br /> ❑ None of the above-Electrical Permit with Plan Review Required <br /> PLEASE FILL OUT A CITY OF EVERETT ELECTRICAL PERMIT APPLICATION IF YOU QUALIFY FOR AN OTC ELECTRICAL PERMIT. <br /> AGREEMENT: I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does not presume to give <br /> authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. That I am <br /> authorized by the owner of this property to perform the work for which application is made and I comply with the State Contractors Law 18.27 <br /> RCW and 296.200 WAC. <br /> City of Everett Official Use Only <br /> ASSOCIATED ELECTRICAL PERMIT# <br /> - 1✓ D i� Lo2Z E <br /> Owner/Authorize ge S nature Date (Revised 42112022) <br />
The URL can be used to link to this page
Your browser does not support the video tag.