Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (22)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (22)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:8.800 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:6.600kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> /1 Aro t HGE�� O © © DESCRIPTION DATE7 REV <br /> i <br /> 110011F.cq 00/FF�MF © gpP S'PRPS'`, <br /> B \ pRE �1e0 OoaDtHG Teo ..�-. <br /> ONO/NCT c'J r GNpPO� � Oj ra <br /> IN <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into < <br /> Bonding Hardware creates bond between splae serrated flange no removes L foot im direction clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad section ©to bond L-Foot to stainless steel T-bolt D <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do <br /> y�Aluminum sell<e ba+spans across rail gap to Serrated T-bott head nd L-fo t ail unodization <br /> V create rad to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail tial force clamp into rail by pushing trj <br /> Stainless steel nut bonds aluminum clamp to stainless steel T-bolt m bond Loop no,and L-root ro <br /> of splice wnl De grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. O <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end N <br /> modules to SM rail 00 <br /> distance from end of raiL module and prior to the Last M <br /> end module. Q O <br /> It p E No <br /> Nut All (� 2—► {{ <br /> WCa waslR.R - - OE. -- O <br /> �— - N-- BONDING Jac o'°g i a a o q� r, ' LL LU <br /> Nr : r.eou cRF gkigF stA � �a 0' (n U 0' O <br /> E D g z>✓E O z w 00 <br /> •SYS7111,11 BONDING BONDING RAIL �A1 j\I > LU > to <br /> OUND MICROINVERTER SPLICE BAR <br /> ♦ MOUNT - - - -� i® W <br /> / WEEBLUG(OR ILSCO LUG) = W LLl O <br /> 1/1' F Q <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with it Qc W Z <br /> Hex mwith caot"lock washer bonds metal (�WEEB washer dimples pierce anodized fait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, G <br /> II 4 microinverter flange to stainless steel T-toll `-a create bond between rail and lugposition module flush 0L 0- <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails O Q <br /> ASSEMBLY tiond T-bolt head penetrates ait noduation- — to to bodi-bollnut.and L-foot to grounded ©Solid copper wine connected to lug isrouted to the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more <br /> A - .-C SMwit-y..,-1,•,,.•,,,,,,. provide hrul system ground connection. between end clamps ends `s than lR•b and module. <br /> ��•,•-� v• P on drill or If using an impact driver,stop rotation as soon as ey <br /> audiurns zylr sup—Imoi—n,aAter- laic:lc..:-g Wn.r•z ce so•:,nr.:e:-,law 1 Module must be fully <br /> a,pvw.dnarr w.rran.r�.:.F�•in. b�"s�b•�-a`�e'�� of rails. impact action of driver begins. i <br /> RAILTO LFOOr ._rt4 -iii jE VALUE See t.. „'..;•,:,lc;�i�,', supported overby hang <br /> and w <br /> ' wyBO110NNG 7-BOLT ( '' cannot overhang ends >> <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. <br /> LO <br /> O <br /> I'l- <br /> Ln <br /> DATE: 11/3/2022 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />