My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 WETMORE AVE CANYON CREEK CHURCH 2023-05-22
>
Address Records
>
WETMORE AVE
>
2201
>
CANYON CREEK CHURCH
>
2201 WETMORE AVE CANYON CREEK CHURCH 2023-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2023 9:47:40 AM
Creation date
5/22/2023 9:47:03 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2201
Tenant Name
CANYON CREEK CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/25/2019 City of Everett Page I <br /> 7:20:27AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1804-003 Site Address 2201 WETMORE AVE <br /> Applied 4/10/2018 Applicant Lot <br /> Approved 4/10/2018 Owner CANYON CREEK CHURCH Block <br /> Issued 4/10/2018 Contractor OWNER Tract <br /> Parent Permit No. B 1803-010 Description REPLACE FURNACE,DUCTING AS NEEDED,BATHROOM FII <br /> Notes (7/16/2019 7:20 AM TKJ) <br /> Changed Contractor;Added plumbing fixtures to scope of work. <br /> Scheduled Completed Tine Inspector Result Remarks Inspector's Comments <br /> 5/15/2018 5/15/2018 MECH 06-FINAL SDP PARTIAL APPR Furnace and ducting OK as noted: <br /> Glue the PVC combustion air and exhaust <br /> fittings and seal the exterior penetration for <br /> the exhaust.Will check at next inspection. <br /> 7/16/2019 7/16/2019 PLUMB SDP APPROVAL <br /> 02-GROUND <br /> 7/25/2019 7/25/2019 PLUMB SDP APPROVAL water service 425-210-5905 Tom <br /> 02-GROUND <br /> 8/1/2019 8/1/2019 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 8/1/2019 8/1/2019 MECH 04-ROUGH SDP APPROVAL <br /> IN <br /> 8/30/2019 8/30/2019 PLUMB 06-FINAL SDP CORRECTION 425-210-5905 <br /> (8/30/2019 2:50 PM SDP) <br /> ADA standards are not met. <br /> Vertical grab bars missing,toilet tank lever <br /> is not on the open side,counter height for <br /> lays is too high,toilet seat cover must be <br /> 48"to the service opening. <br /> 8/30/2019 8/30/2019 MECH 06-FINAL SDP APPROVAL <br /> 9/24/2019 9/24/2019 PLUMB 06-FINAL RRS APPRVD-PERN see notes 425-359-9165 Dan Erickson <br /> AM Inspection requested <br /> (9/24/2019 2:15 PM RRS) <br /> all ADA corrections were made.Contractor <br /> Mr Tom Gibbs construction consulted with <br /> Ted de Budden as to a waiver on Lay <br /> heights.(no wheel chair access). <br /> 9/24/2019 9/24/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CAS YS TE <br />
The URL can be used to link to this page
Your browser does not support the video tag.