My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 WETMORE AVE CANYON CREEK CHURCH 2023-05-22
>
Address Records
>
WETMORE AVE
>
2201
>
CANYON CREEK CHURCH
>
2201 WETMORE AVE CANYON CREEK CHURCH 2023-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2023 9:47:40 AM
Creation date
5/22/2023 9:47:03 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2201
Tenant Name
CANYON CREEK CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
usim <br /> Permit Inspections <br /> VE R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B1803-010 Description: MOVE BASEMENT WALLS,OPEN STAIRWAY, BUILD STAGE, <br /> ADD RSTRMS <br /> Applied:3/6/2018 Approved:4/10/2018 Site Address:2201 WETMORE AVE <br /> Issued:4/10/2018 Finaled: City,State Zip Code: EVERETT,WA 98201-2835 <br /> Status:ARCHIVED-NOT FINALED Applicant:<NONE> <br /> Parent Permit: Owner:CANYON CREEK CHURCH <br /> Parent Project: Contractor:SGP REMODEL LLC <br /> Details: <br /> MOVE BASEMENT WALLS,OPEN STAIRWAY,BUILD STAGE,ADD RSTRMS <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/11/2018 4/11/2018 BLDG 08-FRAMING DAVE FOSTER PARTIAL <br /> APPROVAL <br /> Notes: <br /> Subject to Mechanical,Plumbing,Electrical sign off before cover. <br /> Need to verify 6'3"height at existing stairway-minimum 6'8"IBC. <br /> 8/1/2019 8/1/2019 BLDG 08-FRAMING DAVE FOSTER APPROVAL see noted <br /> Notes: <br /> Verify mechanical rough in sign off before cover. <br /> Than ok to insulate R15 walls. <br /> And ok to drywall-which requires inspection <br /> Note:install guardrails and handrails on all stairways as per IBC for building final. <br /> 8/5/2019 8/5/2019 BLDG 09-DRYWALL TED DE BUDDEN APPROVAL <br /> NAILING <br /> Notes: <br /> AM inspection requested. <br /> Tom Gibbs 425-210-5905 <br /> (8/5/2019 12:22 PM TMB) <br /> Post Address#s <br /> GWB ok to tape at basement. <br /> 8/30/2019 8/30/2019 BLDG 15-FINAL DAVE FOSTER NOT READY <br /> Notes: <br /> electrical scheduled for same day <br /> (8/30/2019 8:41 AM DWF) <br /> Need electrical final before Bldg final inspection. <br /> 4/10/2020 4/10/2020 PERMIT EXTENSION KATHY COLLISON APPROVAL Due to COVID-19 <br /> Notes: <br /> b_ <br /> Printed:Tuesday,09 May,2023 1 of 2 'k <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.