My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W PROVIDENCE 2023-05-22
>
Address Records
>
23RD DR W
>
5901
>
PROVIDENCE
>
5901 23RD DR W PROVIDENCE 2023-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2023 11:09:51 AM
Creation date
5/22/2023 11:08:59 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
PROVIDENCE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> �- Air Management Solutions <br /> Commercial NW/Controls <br /> To: City of Everett <br /> Attn: Drew Martin <br /> 3200 Cedar Street, 2nd Floor <br /> Everett, WA 98201 <br /> Re: Review letter Comments Providence Everett <br /> 5901 23rd Drive W #105, Everett, WA 98201 <br /> Parcel #01118500000500 <br /> Comments <br /> General: <br /> 1. The construction drawings appear to show more units that indicated in the application, <br /> including but not limited to multiple AHUs and an ERV. The location of the minisplit systems is <br /> not clear. The drawings and application should be revised as needed to consistently indicate the <br /> proposed work. Revised <br /> (21 <br /> A schedule for the mechanical equipment should be included in the construction drawings. The <br /> schedule should list the operating weight of each unit. Revised and attached <br /> Architectural: <br /> The drawings indicate penetration of vents through the floor system into the story <br /> above. Details for the concealment of the vents should be included. In addition,fire-rated <br /> penetration details should be included if the vents penetrate rated construction. See IBC <br /> Section 714. Single story no 2"d floor. <br /> Structural:04. etails for the support of the mechanical equipment should be included in the drawings. The <br /> _/supports should include lateral bracing. Calculations substantiating the design should be <br /> submitted for review. See IBC Sections 1604.1 and 1613.1, and ASCE 7-16 Chapter 13. <br /> Revised by Pro Design Structural Engineer(Attached) <br /> 5. The project appears to require cutting large openings in the concrete walls. <br /> a. The size and location (i.e., horizontal and vertical)of the openings should be specified. <br /> Revised by Pro Design Structural Engineer(Attached) <br /> ADDRESS PHONE <br /> 5822 West Werner Road 360-479-6500 <br /> Bremerton, WA 98312 FAX <br /> W EBSITE 360-479-6506 <br /> www.AirManagementSolutionsLLC.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.