Laserfiche WebLink
• • <br /> foundations and slabs-on-grade. Typical tilt-up buildings are required to comply <br /> with the standard and seismic reinforcement detailing requirements of ACI 318 <br /> based on the type of lateral system (i.e. , ordinary or special reinforced <br /> concrete walls) . The engineer should re-evaluate the building as needed. As <br /> stated in previous comments, full-size construction drawings should be submitted <br /> with clear construction-level details. Per comment 4a, if a building permit <br /> application is required, all structural modifications should be included in this <br /> drawing set, not the mechanical drawing set. <br /> The existing warehouse is primarily a 135' x 400' rectangle, with some bump outs. A lateral analysis of the tilt <br /> up wall/metal deck diaphragm for this rectangle is enclosed in the calculations. The panels requiring the <br /> penetrations are part of the shear wall system. The two panels receiving the penetrations have a shear force <br /> of 4.34 KLF,which is equal to 50 PSI which is below the threshold for shear reinforcement for f'c of 4,000. <br /> Typical tilt up mixes range from 4,000 to 6,000. The boundary of the panel next to the man door was checked <br /> and found to have 110 kips under the design event. This corresponds to 390 psi of compression in the tip with <br /> a tip element on the order of 6#7 bars within a closed tie. As the structural drawings were unavailable to us it <br /> is unknown what this tip element is, however even an 8 bar tip would be 24"long or less. Conclusion—the <br /> proposed hole occurs outside of a panel tip element in a panel not requiring shear reinforcement. <br /> Seismic forces for out of plane loads was found to be 0.4*W,for the 7-1/4"panel that is 35.35 PSF, 110 MPH <br /> Exp C wind is 27.0 PSF so seismic controls. Panel height at the opening is 27 feet, loaded at the 35.35 x 2' x <br /> 1.0/1.6 load factor adjust (LL vs E)found Mu =6.30 'k, a 7-1/4"panel,4,000 PSI with#5 @ 12"oc centered <br /> has Phi Mn of 7.73'k is satisfactory,is is agreed that the tilt up is probably heavier than this, but this is what <br /> needs to be replace at the hole. The taller panel is 27.0', review a 2 foot wide strip. The moment is 2 x <br /> 0.03524 x 27"2/8=6.42`k. Per the concrete spreadsheet#5 @ 12 has 2#5 located at centerline has a Phi Mn <br /> of 7.73 'k. On each side of the opening provide steel to replace this lost capacity that extends at least the <br /> reinforcement lap length, 26", past the opening each side. <br /> The reinforcement steel angles are to be GR 50, using ASD design for simplicity with Fb=33 KSI, providing a <br /> higher load factor than required (E=1.0 vs 1.5 LF of ASD). The required moment is 6.42 'k/2 members =3.21 <br /> `k,the required section is 3.21 x 12/33 = 1.167 in^3. A L5x3x1/4 has S=1.51 in^3 so fb=25.5 ksi—OK. See <br /> the Hilti printout for the anchors. <br /> 6. Fan EF-1 weighs 136 pounds and will be mounted overhead, representing a <br /> significant falling hazard. Support details capable of resisting vertical and <br /> lateral loading should be included in the drawings. The supports should be <br /> designed per ACSE 7-16 Chapter 13. <br /> Fan EF-1 is mounted within the 20.25 x20.25 cut out opening in the tilt up in a near balanced condition. The <br /> 136#is offset by the removal of 250 pounds of concrete. <br /> The five radiant heaters each weigh 130 pounds, details on M-2 show the hanging, the bracing cables, and the <br /> reinforcement of the roof deck where the 4"vent thimble occurs. <br /> Please contact me if you have questions. Thank you. <br /> G . B, <br /> F,GE WASy�NC z� <br /> i, 2< / W <br /> O 6721 w <br /> �4'CISTERE� 1� <br /> SS�ONAL ECG <br /> WASH CIVIL, MECH, & STRUCTURAL ENGINEER 12-4-22 <br /> John G. (Jay) Bartram S.E., P.E. <br />