Laserfiche WebLink
Element 3.Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ® BMP C240:Sediment Trap <br /> ❑ BMP C241:Temporary Sediment Pond <br /> ❑Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 4.Install sediment controls: <br /> ❑ BMP C23 I:Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ® BMP C233:Silt Fence <br /> ❑ BMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> El BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> ❑Other Per theSWMMWW: <br /> El Not applicable to my proposed project <br /> Explain: <br /> Element 5.Stabilize soils: <br /> ® BMP C 120:Temporary and Permanent Seeding <br /> e BMP C 121:Mulching <br /> ❑ BMP C 122:Nets and Blankets <br /> ❑ BMP C 123:Plastic Covering <br /> ❑ BMP C 124:Sodding <br /> ❑ BMP C 125:Topsoiling/Composting <br /> ❑ BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C I 30:Surface Roughening <br /> ❑ BMP Cl31:Gradient Terraces <br /> ❑ Other Per theSWMMWW: <br /> O Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 <br />