My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9113 9TH AVE SE 2023-05-23
>
Address Records
>
9TH AVE SE
>
9113
>
9113 9TH AVE SE 2023-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 3:40:00 PM
Creation date
5/23/2023 11:39:44 AM
Metadata
Fields
Template:
Address Document
Street Name
9TH AVE SE
Street Number
9113
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2212-009 Description: remodel wiring FOR AFH <br /> Applied: 12/1/2022 Approved: 12/1/2022 Site Address: 9113 9TH AVE SE <br /> Issued: 12/5/2022 Finaled: 3/22/2023 City,State Zip Code: EVERETT,WA 98208 <br /> Status: FINALED Applicant:TRUSTED POWER ELECTRIC LLC <br /> Parent Permit: B2201-011 Owner: BEKELE YITAGESSU/SAHILE SENITE <br /> Parent Project: Contractor:TRUSTED POWER ELECTRIC LLC <br /> Details: <br /> Need to relocate circuits due to new framing layout <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> ELEC 10-FINAL ELEC INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 3/16/2023 6:26 AM TRUSTED POWER ELECTRIC LLC <br /> Contact Name:TRUSTED POWER ELECTRIC LLC <br /> Site Address:9113 9TH AVE SE <br /> Phone:4254434009 <br /> e-Mail:abraham@trustedpower.org <br /> 12/7/2022 12/7/2022 ELEC 06-ROUGH IN MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 12/6/2022 5:46 PM TRUSTED POWER ELECTRIC LLC <br /> Contact Name:TRUSTED POWER ELECTRIC LLC <br /> Site Address:9113 9TH AVE SE <br /> Phone:4254434009 <br /> e-Mail:abraham@trustedpowerelectricllc.com <br /> 1)Mechanical and plumbing rough in inspections must occur prior to the electrical rough in inspection <br /> 2)secure unsupported electrical box in the dining area. <br /> 3)reduce the number of conductors going thru the wall plates above the panels,the number of conductors exceed the allowable amount before <br /> derating. <br /> 12/9/2022 12/9/2022 ELEC 06 ROUGH IN MICHAEL CORRECTIONWICKLANDER REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 12/8/2022 5:39 PM TRUSTED POWER ELECTRIC LLC <br /> Contact Name:TRUSTED POWER ELECTRIC LLC <br /> Site Address:9113 9TH AVE SE <br /> Phone:4254434009 <br /> e-Mail:abraham@trustedpowerelectricllc.com <br /> 1)Obtain a Mechanical permit for the new ducting in bathroom and bedrooms inspection must be performed prior to electrical rough in inspection. <br /> I <br /> Printed:Wednesday, 22 March, 2023 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.