EROSION AND SEDIMENTATION CONTROL <br />Stormwater Pollution Prevention Plan elements are described below. <br />Element #1: Preserve Vegetation/Mark Clearing Limits <br />Temporary fencing will be used to delineate the limits of construction. <br />Element #2: Establish Construction Access <br />The existing paved parking lot will be used for access to the construction site. A wheel wash or <br />vacuum sweepers shall be used to prevent tracking of sediment onto the adjacent public <br />roadways. <br />Element #3: Control Flow Rates <br />Straw wattles will be installed adjacent to existing pavement areas to prevent stormwater from <br />exiting the site. <br />Element #4: Install Sediment Controls <br />Straw wattles will be installed to prevent runoff from exiting the project site area. <br />Element #5: Stabilize Soils <br />Not applicable. The existing vegetated embankment will not be disturbed as part of this project. <br />Any soil disturbance will be hydroseeded. <br />Element #6: Protect Slopes <br />Not applicable. The existing vegetated embankment will not be disturbed as part of this project. <br />Element #7: Protect Drain Inlets <br />Catch basin filter inserts will be installed in existing catch basin structures within and <br />downstream of the site. <br />Element #8: Stabilize Channels and Outlets <br />Not applicable. There are no existing or proposed channels or outlets at the project site. <br />Element #9: Control Pollutants <br />Use dust control measures to reduce wind transport of dust during demolition operations. <br />Maintain good housekeeping and preventative measures for vehicle and construction equipment <br />storage. <br />Element #10: Control Dewatering <br />Dewatering is not necessary for the scope of the project. <br />Stormwater Site Plan 8 • , �, , , <br />1216 Broadway Surface Parking Lot <br />