Laserfiche WebLink
i • <br /> Hello Grace and Thad, <br /> The developer has made a few changes to the project,most notably to omit the proposed <br /> Detail Building and and a 3rd row of vacuums. The following is a list of changes to our plans. <br /> 1.Omitted Detail Building <br /> 2.Added 3rd row of vacuums with added vac building <br /> 3.Revised dimensions for original double row of vacs <br /> 4.Moved matt cleaner and vac pay station <br /> 5.Revised grades and section for lowered footing at SW corner of car wash <br /> S.Revise power and CAN pathways <br /> 7.Revised sewer depths for Sonic <br /> 8.Added 2 parking lights for 3rd row vacs <br /> 9.Updated landscaping per site changes <br /> 10.Revised ramp design at NW corner of main intersection <br /> 11.Updated vault design due to structural design concerns. <br /> Please let me know if you have any questions.We are moving forward site construction and <br /> hope that you can take a look and approve these relatively minor changes soon. <br /> Thank You, <br /> Pedro DeGuzman,PE <br /> Terraforma Design Group,Inc. <br /> VECEIVE1 <br /> A!' 3 1 2P?2 <br /> CITY OF EVERETT <br /> Permit Services <br />