My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10312 EVERGREEN WAY SONIC Geotech Report 2023-05-25
>
Address Records
>
EVERGREEN WAY
>
10312
>
SONIC
>
Geotech Report
>
10312 EVERGREEN WAY SONIC Geotech Report 2023-05-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 1:47:29 PM
Creation date
5/25/2023 1:45:46 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10312
Tenant Name
SONIC
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report 8 January 8,2021 <br /> Glint Car Wash and Sonic Everett,Everett,Washington RGI Project No.2020-643-1 <br /> Table 2 Structural Fill Gradation <br /> U.S.Sieve Size Percent Passing <br /> 4 inches 100 <br /> 3/4 inch 70 minimum <br /> No. 4 35 to 60 <br /> No. 200 0 to 5* <br /> *Based on minus 3/4 inch fraction. <br /> Prior to use, a RGI representative should observe and test all materials imported to the <br /> site for use as structural fill. Structural fill materials should be placed in uniform loose <br /> layers not exceeding 12 inches and compacted as specified in Table 3.The soil's maximum <br /> density and optimum moisture should be determined by ASTM D1557. <br /> Table 3 Structural Fill Compaction ASTM D1557 <br /> Minimum Moisture Content <br /> Location Material Type Compaction <br /> Range <br /> Percentage <br /> Foundations On-site granular or approved 95 +2 -2 <br /> imported fill soils <br /> Retaining Wall Backfill • On-site granular or approved 92 +2 -2 <br /> imported fill soils <br /> Slab-on-grade On-site granular or approved 95 +2 -2 <br /> imported fill soils <br /> General Fill (non- On-site granular or approved 90 • +3 -2 <br /> structural areas) imported fill soils <br /> Pavement, Subgrade On-site granular or approved 95 +2 -2 <br /> and Base Course imported fill soils <br /> Placement and compaction of structural fill should be observed by RGI. A representative <br /> number of in-place density tests should be performed as the fill is being placed to confirm <br /> that the recommended level of compaction is achieved. <br /> 5.3 FOUNDATIONS <br /> The proposed building foundations should be supported on 18 inches of structural fill. <br /> Perimeter foundations exposed to weather should be at a minimum depth of 18 inches <br /> below final exterior grades. Interior foundations can be constructed at any convenient <br /> depth below the floor slab. Finished grade is defined as the lowest adjacent grade within <br /> Corporate Office <br /> 17522 Bothell Way Northeast <br /> Bothell,Washington 98011 <br /> Phone 425.415.0551• Fax 425.415.0311 <br /> 14 -14w.rilev-group.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.