Laserfiche WebLink
2021 Stormwater System Development Fee Calculations <br />Permit M PW2104-014 <br />Additional Notes: <br />Project Address: 3322 Kromer Avenue <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name. <br />calculated on Public Works Permit and roof hard surfaces calculated on Building ermit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />I I <br />_ <br />Prepared By: Date: /12/20L <br />Sewer District: Everett <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2104-022 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />2,273 SF <br />Stormwater System Dev Fee: <br />$598.48 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2104-014 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />722 1 SF <br />Stormwater System Dev Fee: <br />$190.10 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />0 <br />