Laserfiche WebLink
Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and. <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site conditions and construction activities that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures used to <br />control the quality of stormwater discharges. Whenever inspection and/or monitoring <br />reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br />actual discharge of or potential to discharge a significant amount of ,any pollutant, <br />appropriate BMPs or design changes shall be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP: <br />The construction SWPPP shall be retained on -site or within reasonable access to the site. <br />The­-SWPPP. shall "be modified -whenever there As a change in the design, construction, <br />operation, or maintenance at the construction site that has, or could have, a significant <br />effect on the discharge of pollutants to waters of the state.. <br />The SWPPP shall be modified if, during- inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that <br />the SWPPP is ineffective. in eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to .include <br />additional or modified BMPs designed to correct problems identified. Revisions to the <br />SWPPP shall be completed within seven days following inspection. <br />13: Protect On -Site Stormwater Management BMPs for Runoff from Hard Surfaces <br />The use of on -site management BMP's for this project will allow for the installation of the <br />perforated stubout at the end of the project during final stabilization. That will protect <br />those areas" from disturbance or compaction. 1n --addition, the organic content of `the <br />amended soils will be tested and verified prior to final project acceptance. <br />5. SOURCE CONTROL . <br />This project. proposes to construct a SFR and driveway. Per Volume 4 of the 2019 DOE <br />SWMMWW, residential development does not require source control. <br />6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br />The runoff from the site improvements will either be dispersed on site or tightlined to the <br />city stormwater system. However, by not grading or compacting the majority of. the <br />pervious surfaces "to"remain after construction -in the area of disturbance' a maximum <br />amount of site runoff from the developed project will be absorbed and infiltrated into the <br />existing on -site soils. This will mimic the existing conditions by maintaining the .existing <br />direction and condition of flow from this site. <br />Kikuchi SFR 21-0104 <br />September 2021 Page 8 <br />