My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 KROMER AVE Geotech Report 2023-05-25
>
Address Records
>
KROMER AVE
>
3322
>
Geotech Report
>
3322 KROMER AVE Geotech Report 2023-05-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 3:43:13 PM
Creation date
5/25/2023 3:43:13 PM
Metadata
Fields
Template:
Address Document
Street Name
KROMER AVE
Street Number
3322
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Report's Recommendations are Not Final <br /> Do not over-rely on the construction recommendations included in this report. Those <br /> recommendations are not final, because geotechnical engineers or geologists develop them <br /> principally from judgment and opinion. GeoTest's geotechnical engineers or geologists can <br /> finalize their recommendations only by observing actual subsurface conditions revealed during <br /> construction. GeoTest cannot assume responsibility or liability for the report's recommendations <br /> if our firm does not perform the construction observation. <br /> A Geotechnical Engineering or Geologic Report may be Subject to Misinterpretation <br /> Misinterpretation of this report by other design team members can result in costly problems. <br /> Lower that risk by having GeoTest confer with appropriate members of the design team after <br /> submitting the report. Also, we suggest retaining GeoTest to review pertinent elements of the <br /> design teams plans and specifications. Contractors can also misinterpret a geotechnical <br /> engineering report. Reduce that risk by having GeoTest participate in pre-bid and <br /> preconstruction conferences, and by providing construction observation. <br /> Do not Redraw the Exploration Logs <br /> Our geotechnical engineers and geologists prepare final boring and testing logs based upon their <br /> interpretation of field logs and laboratory data. To prevent errors of omissions,the logs included <br /> in this report should never be redrawn for inclusion in architectural or other design drawings. <br /> Only photographic or electronic reproduction is acceptable; but recognizes that separating logs <br /> from the report can elevate risk. <br /> Give Contractors a Complete Report and Guidance <br /> Some owners and design professionals mistakenly believe they can make contractors liable for <br /> unanticipated subsurface conditions by limiting what they provide for bid preparation. To help <br /> prevent costly problems, give contractors the complete geotechnical engineering report, but <br /> preface it with a clearly written letter of transmittal. In that letter, consider advising the <br /> contractors that the report was not prepared for purposes of bid development and that the <br /> report's accuracy is limited;encourage them to confer with GeoTest and/or to conduct additional <br /> study to obtain the specific types of information they need or prefer. A pre-bid conference can <br /> also be valuable. Be sure contractors have sufficient time to perform additional study. Only then <br /> might you be in a position to give contractors the best information available,while requiring them <br /> to at least share some of the financial responsibilities stemming from unanticipated conditions. <br /> 3 <br /> llnformation in this document is based upon material developed by ASFE,Professional Firms Practicing in the Geosciences(asfe.org) <br />
The URL can be used to link to this page
Your browser does not support the video tag.