My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 PACIFIC AVE 2023-05-26
>
Address Records
>
PACIFIC AVE
>
2120
>
2120 PACIFIC AVE 2023-05-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2023 9:27:42 AM
Creation date
5/26/2023 9:22:53 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
2120
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 1/28/2023 <br />City Of Everett Permit Services <br />Public Works Permit N: PW2301cD18 <br />3200 Cedar Street, 2"°Floor Associated Bldg Permit N: <br />E V E R E T T Everett, WA 98201 Planning Reference N: <br />WASH EATON everettwa.eov/permits Public Works Fee: $133.57 <br />Permitservicesgeyerettivil schedule Inspections at; onlinerermilveverettwa.anv <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />KIMBALL HOLDINGS LM REID SHOCKEY, SHOCKEY PLANNING GROUP <br />2120 PACIFIC AVE <br />EVERETT, WA 982014438 <br />PHONE: PHONE: 4252589308 <br />SITE ADDRESS: 2120 PACIFIC AVE TAX PARCEL me 00439074202100 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: ASPHALT PAVING AND PARKING STALL STRIPING PER PLANS <br />PERMRCONDITIONS: <br />1. All inspections shall be scheduled online at httos://O mumermlts.everettwa.as. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett'Deeign and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER $11. <br />4. Site CMI Work to be done Per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at all <br />times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwaS ov to formally <br />request all required inspections. A handout is provided at permit Issuance with' instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SW PPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />J. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />S. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from <br />the City's Traffic Engineering Division. This permit can be applied for online at onlinepennits.everettwa.gov and requires a traffic control plan to <br />be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />11. This permit must be finaled in order to dose out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br />PW 25-Site Final/Permit Code Out within the Online Permitting Portal Inspection Rental for this permit when all Items have been completed. <br />Public Works Permit Fee Breakdawn <br />Pavingl885F).......................................................$45.00 <br />Mix. Minor Permits(Striping Work)...................$25A0 <br />PW Plan Review...................................................$20.00 <br />PW Site Inspection..............................................$20AHO <br />Stormwater System Development Fee _.............$23.57 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br />claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the Improvement or other right <br />of -way use here to applied for and further agrees to remove same upon notice from the City and to replace public Property damaged thereby. <br />VALIDITY/EXPIIIATION: <br />Work authorized by this Permit must be started within 180 days of age permit is issued and diameter is to be diligently pursued to completion. This <br />permit may be canceled by the city upon any stoppage W work on this Project over 180daytluration. Each inspection expends the expiration date <br />180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_AmUCzNT/IOa SITE 00" _address FILE _ffissu Pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.