Laserfiche WebLink
From: <br />Todd Rosholt <toddrosholt10@gmail.com> <br />Sent: <br />Wednesday, April 13, 2022 7:59 AM <br />To: <br />Tawnya Herman <br />Subject: <br />[EXTERNAL] Re: U2204-016 9727 31 ST AVE SE <br />Attachments: <br />1.Site Plan draft.pdf, 24x18 ORIGINAL (2).pdf <br />Follow Up Flag: <br />Follow up <br />Flag Status: <br />Completed <br />CAUTION: This email originated from outside of the organization.. Do not click links or open attachments unless you <br />recognize the sender and know the content is safe. <br />Good morning Tawnya <br />Correct. The existing house will remain with the existing sewer connection. I will need 3 new additional <br />connections, one for lot 1, 3 and also a new DADU being built behind the existing house on lot 2. <br />See attached site and architectural plans. Please let me know if you have any further questions. <br />Thanks Todd <br />On Wed, Apr 13, 2022 at 7:27 AM Tawnya Herman <THerman@everettwa.eov> wrote: <br />Todd — <br />It looks as though the existing SFR would continue to use their existing sewer connection. Are you proposing to change <br />that connection, or are you really only needing 2 more sewer connections? <br />1 <br />