Laserfiche WebLink
icil <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> 5/17/2022 5/17/2022 PW 07-STORM RANDY ALLEN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Contractor installing 72 inch detention pipe <br /> 5/18/2022 5/18/2022 PW 07-STORM RANDY ALLEN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Contractor continuing to install 72 inch detention pipe <br /> 5/19/2022 5/19/2022 PW 07-STORM RANDY ALLEN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Contractor finished installing 72 inch detention pipe <br /> 5/20/2022 5/20/2022 PW 07-STORM RANDY ALLEN PARTIAL <br /> APPROVAL <br /> Notes: <br /> 6/1/2022 6/1/2022 PW 07-STORM RANDY ALLEN APPROVAL <br /> Notes: <br /> Contractor installed cut off drain on the west end of the property and install piping to the storm drain <br /> 6/2/2022 6/2/2022 PW 07-STORM RANDY ALLEN PARTIAL <br /> APPROVAL <br /> Notes: <br /> PW 21 PARTIAL <br /> 6/6/2022 6/6/2022 UNDERGROUND JIM KNAPPERT <br /> UTILITY INSPECTION APPROVAL <br /> Notes: <br /> Water service 2 inch poly pipe for each lot <br /> (6/6/2022 2:31 PM JHK) <br /> Installing water service pipe. <br /> PARTIAL <br /> 6/7/2022 6/7/2022 PW 22-OTHER RANDY ALLEN APPROVAL consult with Paul <br /> Notes: <br /> Discuss curb gutter sidewalks instructed contractor that he would have to Cut existing asphalt 3'3"so they can get a roller vibratory roller to compact <br /> new asphalt next to Curb <br /> PW 16-CONCRETE <br /> 6/24/2022 6/24/2022 FORMWORK RANDY ALLEN APPROVAL <br /> EVALUATION <br /> Notes: <br /> Printed:Wednesday,29 March,2023 7 3 of 6 j r4 <br /> SUPER1ON <br />