My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 W INTERCITY AVE 2023-05-30
>
Address Records
>
W INTERCITY AVE
>
12
>
12 W INTERCITY AVE 2023-05-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2023 2:04:31 PM
Creation date
5/30/2023 2:04:22 PM
Metadata
Fields
Template:
Address Document
Street Name
W INTERCITY AVE
Street Number
12
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 3/23/2023 <br /> City of Everett Permit Services Public Works Permit#: PW2303-014 <br /> 3200 Cedar Street, 2" Floor Associated Bldg Permit#: <br /> EVERETTEverett, WA 98201 Planning Reference#: <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $85.00 <br /> PermitServices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERIST ROBERT EVERIST ROBERT <br /> 12 W INTERCITY AVE 12 W INTERCITY AVE <br /> EVERETT,WA 98204-2730 EVERETT,WA 98204-2730 <br /> PHONE:4255300729 PHONE:4255300729 <br /> SITE ADDRESS: 12 W INTERCITY AVE TAX PARCEL ID#:00480201000100 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:Gravel the Right-of-Way in front of property <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. <br /> 6. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 7. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 8. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on- <br /> site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 9.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> 10. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of <br /> the right-of-way for municipal purposes. <br /> PUBLIC WORKS PERMIT FEE BREAKDOWN: Ilaau E <br /> O S <br /> 11 <br /> Paving(1411SF Gravel) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 MAR 3 0 2023 <br /> ACKNOWLEDGEMENT OF CONDITIONS CITY OF EVER :TT <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save InrilfiiittIg gitv itgverett from any and all <br /> claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right- <br /> of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This <br /> permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date <br /> 180 days to keep the permit open while work is active. <br /> Page 1of1 <br /> _APPLICANT/JOB SITE COPY x ADDRESS FILE TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.