Laserfiche WebLink
DONE! <br /> You have now completed the Small Project Stormwater Report. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> Ili:I'Project Specific Stormwater SitePlan <br /> Topographic Survey tip 1C6NAc t3r3 <br /> Declaration of Covenant and Grant of Easement <br /> IYConstruction SWPPP Drawings cyh 1 ----17SC <br /> ❑ Underground Injection Well(UIC)Registration* <br /> *You may need to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing UIC Construction. For more information, visit: <br /> everettwa.gov/1985/Stormwater-Technical-Resources <br /> b. <br />