Laserfiche WebLink
STEP 3. DETERMINE FLOW CONTROL REQUIREMENT area item Efrom <br /> Does this ro ect create reater than 200 square feet of net new impervious ( <br /> P j g <br /> table above)? <br /> Yes No tire <br /> If yes, then the project is not exempt and flow control is required. Complete en <br /> checklist. <br /> If no, then the project is exempt from the flow control requirement. Skip the rest of <br /> Step 3 and complete STEPS 4 and 5 of this spreadsheet. <br /> Determination of 'fee in-lieu of flow control' eligibility: <br /> Is the project in the eligible sub-basin of the combined sewer area as depicted in Figure 6-10.1 <br /> of the C of Everett Design and Construction Standards and Specifications? <br /> Yes No <br /> If no, then the fee option is not available for your project. Skip the fee calculation <br /> below and complete the rest of the checklist. <br /> If yes, will this project choose to take �e fee o• ion instead of designing and i s lli g <br /> flow control facility? f j —�' /I <br /> If yes, then calculate fee using the to•le 'elow ar complete Steps 4 and 5 of this <br /> checklist (Step 6 not required). <br /> If no, skip the fee calculation below and complete the rest of the checklist. <br /> Table for calculation of fee in-lieu-of flow control <br /> I. Enter total net new impervious (Item j j I,��I.� <br /> D from table above) <br /> 2. Subtract 200 sf ii <br /> 3. Fee per sf $3,72/SF <br /> Calculate Total Fee by multiplying item #2 by <br /> item #3 <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 5 <br />