Laserfiche WebLink
I <br /> 0 Task 3: Attach Project Specific Stormwater Site Plan Drawings(required) <br /> See City of Everett standard drawings#100-104for stormwater site plan requirements and <br /> examples,including a Temporary Erosion&Sediment Control(TESC)plan drawing <br /> example and drainage plan drawing example,available online <br /> ateverettwa.gov/DocumentCenterNiew/7040 <br /> (Y)1 <br /> Str 'flt <br /> No <br /> 0Task 4: Attach Topographic Survey(if applicable) .q ji ?JkU1u1f11cM <br /> i ) <br /> A topographic surveyprepared registered land surveyor, civil engineer or otherSfti. J0�P bP Y a <br /> qualified professional is required if your project site includes steep slopes,critical areas, <br /> flood or geologic hazards or at the discretion of the stormwater reviewer. <br /> ,,g) 0p <br /> -- S6) <br /> 0h1�, I c 0 111 <br /> Task 5: Attach Declaration of Covenant QO 1 U() ,t <br /> To ensure future maintenance and allow access for inspection,any development <br /> project which constructs stormwater facilities must have a Declaration of Covenant. <br /> Fill out and attach the Declaration of Covenant. For a copy,didcon the Permitting <br /> Resources tab at everettwa.gov/1985/Stormwater-Technical-Resources. <br /> City of Everett Public Works <br /> Small Project stormwater Site Plan Report for Projects in 8 <br /> the Combined Sewer Area-April 2021 <br />