Laserfiche WebLink
Element 3.Control flow rates: <br /> ❑BMP C203:Water Bars <br /> BMP C240:Sediment Trap <br /> ❑9MP C241:Temporary Sediment Pond <br /> Other Per the SWMMW W: C/ <br /> 0 Not applicable to my raosvi7:1Mct <br /> Explain: , 451t, <br /> Element 4.Install sediment controls: <br /> D BMP C23 I:Brush Barrier <br /> O BMP C232;Gravel Filter Berm <br /> M"BMP C233:Silt Fence <br /> IVBMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑BMP C24 I:Temporary Sediment Pond <br /> ❑Other Per the SWMMWW: <br /> CI Not applicable to my proposed project <br /> Explain: <br /> El9ment 5.Stabilize soils: <br /> BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 121:Mulching <br /> ❑ BMP C 122:Nets and Blankets <br /> 621'BMP C 123:Plastic Covering <br /> ❑BMP C 124:Sodding <br /> ❑BMP Cl25:Topsoiling/Composting <br /> ❑BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C 130:Surface Roughening <br /> ❑ BMP C 13 I:Gradient Terrace <br /> to <br /> Etirpther <br /> Not applicable to proposed project <br /> Explain: V11 <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 11 <br /> the Combined Sewer Area-April 2021 <br />