My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2119 LOMBARD AVE 2023-05-30
>
Address Records
>
LOMBARD AVE
>
2119
>
2119 LOMBARD AVE 2023-05-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2023 3:30:17 PM
Creation date
5/30/2023 3:28:03 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2119
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 6. Flow Control <br /> All projects triggering the flow control thresholds shall employ flow control BMPsto infiltrate, <br /> disperse or detain stormwater runoffon-site to meet the flow control requirements of section 6.10 <br /> of the DOSS. Projects that create 2,000 sf or more of net new Impervious area shall provide flow <br /> control designed by an Engineer. Use of the sizing tables below will not be allowed for projects <br /> with 2,000 sf or more net new impervious area. <br /> The three options for meetingthe flow control requirement includ= dispersion r <br /> (infiltration trench or bioretention)and detention. <br /> Flow Control BMP Selection <br /> Identify(check box of)the BMP that will be used to meet the flow control requirement <br /> in the table below.All BMP's shall be designed to meet the flow requirements of <br /> Section 6.10 of the DCSS. <br /> Table 1. Flow Control BMA Selection <br /> Option Type DCSS Design 2019 SWMMWW <br /> Requirement Design Guidance: <br /> Sections: <br /> I. Downspout BMP T5.10B: <br /> Dispersion OR <br /> System* <br /> BMP 5.30: <br /> lnfikrado I 4-4.3 (2) BMP T5.10A: PHMAITrench <br /> ❑ 213. Rain Gardens 4-4.3 (4) BMPT7.30: <br /> Bioretention COE Standard Plan See Figure V-5.12 <br /> Cells and Swales 426 <br /> ❑ a Detention Section 4-4.4 BMP D.2 <br /> (2),and 4-4.4 or BMP D.3 <br /> (3) <br /> See Figure V12.1 <br /> COE <br /> Standard <br /> Plans 415-418 <br /> *For roof runoff only.To provide flow control from other surfaces,use option 2 or 3. <br /> All facilities shall meet the facility access requirements of section 4-4.2, and Maintenance requirements of <br /> section 4-4.2(5)of Volume I of the DCSS. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 5 <br /> the Combined Sewer Area April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.