Laserfiche WebLink
COMP <br /> LETE IF USING INFILTRATION (2A or 2B) TO MEET FLOW <br /> CONTROL REQUIREMENT <br /> Determine whether infiltration has been pre-determined to be infeasible for any portion of your <br /> project site. <br /> • Review the infiltration infeasibility mapping tool available on"Map Everett' <br /> C:3 everettwa.gov/mapeverett. <br /> • On the mappingtool,select"Geotechnical/Infiltration Infeasibility Area"and the <br /> applicable"Property"layers from the Layer List. <br /> • Zoom into your project site and print the resulting map to showthe project site <br /> boundaries and the infiltration infeasibility mapping results. <br /> ■ Areas mapped as red have been pre-determined to be infeasible for infiltration. <br /> ■ Areas mapped as green are potentially feasible for infiltration and must be <br /> assessed further for infiltration feasibility,as discussed further below. <br /> 0 ■ Attach a printed copy of the map clearly showing your project site boundary and the <br /> infiltration infeasibility mapping results. <br /> * If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br /> If you selected Rain Garden/Bioretention (2B), on-site soils information for sizing is <br /> required from I through 3 below. <br /> Submit the following information to Permit Services with this report: <br /> I. A USDA Custom Soil Re ort from ht s://websoilsurve c.e ov.0 da. ov <br /> 2. USDA Soil Type(s)= (,/1 1 ^ ria444() ' ! ' l: 2-z- y j6v,3 <br /> 3. Measured Infiltration Rate = in/hr, measured at BMP location on-site. Use Rain Garden <br /> andbook methodology for infiltration test. tier 1. tik ,-----_________. <br /> v <br /> Ni,,,,,t, _L._ ,,......„, 0 <br /> ,iCtJrytuaE Y&4L h/) <br /> 'I, <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 20 <br />