Laserfiche WebLink
r <br /> You have now completed theDONE!Small Project Stormwater Report. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> D'Project Specific Stormwater Site Plan <br /> Topographic Survey ro:. 1 fjJ\IJlVa ( <br /> RI/ <br /> Declaration of Covenant and Grant of Easement <br /> C"Construction SWPPP Drawings c- h. ) --" C <br /> ElUnderground Injection Well(UIC)Registration* <br /> *You may need to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing U/C Construction. For more information, visit: <br /> everettwa.gov/1985/Stormwater-Technical-Resources <br /> r <br />