My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2119 LOMBARD AVE 2023-05-30
>
Address Records
>
LOMBARD AVE
>
2119
>
2119 LOMBARD AVE 2023-05-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2023 3:30:17 PM
Creation date
5/30/2023 3:28:03 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2119
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WoodWorks® Shearwalls Youngblut.wsw Jun. 10, 2021 16:51:09 <br /> HOLD-DOWN DESIGN(flexible wind design,continued) <br /> 4-1 R Op 1 33.00 34.38 78 <br /> 4-1 R End 33.00 34.88 18 <br /> Line B <br /> B-1 L End 0.12 11.00 Min 833 2033 <br /> B-1 R End 32.88 11.00 Min 833 2179 <br /> Line C <br /> C-1 L End 0.12 35.00 1 120 <br /> C-1 L Op 3 1.88 35.00 1 420 <br /> C-1 L End 7.13 35.00 Min 403 1665 <br /> C-1 R End 29.63 35.00 Min 403 1515 <br /> C-1 R Op :3 32.38 35.00 1 195 <br /> C-1 R End 32.88 35.00 1 45 <br /> Legend: <br /> Line-Wall: <br /> At wall or opening-Shearline and wall number At vertical element-Shearline <br /> Posit'n-Position of stud that hold-down is attached to: <br /> V Elem-Vertical element:column or strengthened studs required where not at wall end or opening <br /> L or R End-At left or right wall end <br /> L or R Op n- At left or right side of opening n <br /> t©Op n- Uplift force tat opening n from offset opening in perforated wall above,from SDPWS 4.3.6.2.1 <br /> Location-Co-ordinates in Plan View <br /> Load Case-Results are for critical load case: <br /> ASCE 7 All Heights:Case 1 or 2 from Fig.27.3-8 <br /> ASCE 7 Low-rise:Windward comer(s)and Case A or B from Fig.28.3-1 <br /> ASCE 7 Minimum loads(27.1.5/28.3.4) <br /> Hold-down Forces: <br /> Shear-Wind shear overturning component,based on shearline force,factored for ASD by 0.60.For perforated walls, T from SDPWS 4.3-8 is used. <br /> Dead-Dead load resisting component,factored for ASD by 0.60 <br /> Uplift-Uplift wind load component,factored for ASD by 0.60.For perforated walls, T from SDPWS 4.3-8 is used. <br /> Cmb'd-Sum of ASD-factored overturning,dead and uplift forces. May also include the uplift force t from perforated walls from SDPWS 4.3.6.2.1 when <br /> openings are staggered. <br /> Hold-down-Device used from hold-down database <br /> Cap-Allowable ASD tension load <br /> Crit.Resp.-Critical Response=Combined ASO force/Allowable ASD tension load <br /> Notes: <br /> 1/2 AB for studs with thickness>0'-1.5": 1650 tension allowable per anchor bolt. Assume 2 per segmented wall <br /> Plate for studs with thickness>0'-1.5"and depth>0'-5.5":Assumes min 12'plate(2) 16d at 16"oc+2 at end 92#x12=1104 CD= 1.67 <br /> Refer to Shear Results table for factor Co,and shearline dimensions table for the sum of Li,used to calculate tension force T for perforated walls from <br /> SDPWS Eqn.4.3-8. <br /> Designer is responsible for design of connection from wall to floor or foundation for shear force shown in Shear Results table. Refer to SDPWS 4.3.6.4.3 for <br /> foundation anchor bolt requirements. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.