My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2119 LOMBARD AVE 2023-05-30
>
Address Records
>
LOMBARD AVE
>
2119
>
2119 LOMBARD AVE 2023-05-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2023 3:30:17 PM
Creation date
5/30/2023 3:28:03 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2119
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICOORKS PERMIT <br /> Public rks ate Applied:Permit#: PW21077/29/2021073 <br /> City of Everett Permit Services <br /> - <br /> 3200 EverettCedar Street,98201 2"d Floor AssociatedPlanning BldgReference#Permit#:: B2103-087 <br /> EVERETT , WA <br /> WASHINGTON 425-257-8810 Public Works Fee: $215.29 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME ADDRESS: <br /> YOUNGBLUT DWAYNE M&KASIDEE K CHRISTI RINE <br /> 2119 LOMBARD AVE ,t' C ,V- <br /> EVERETT,WA,98201 , , i <br /> PHONE:4254185631 PHONE:42529: -140 y z5 0 Lt 2\ <br /> TAX PARCEL ID#:00439143901000 SITE ADDRESS:2119 LOMBARD AVE <br /> DESCRIPTION:Site work for two story ADU <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector>Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on- <br /> site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection R u fo is ermit when all items have been <br /> completed. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $50.00 <br /> el) <br /> Paving(210 SF) $45.00 JAN 2 Misc. Minor Permits(Drainage Work) $25.00 �0 22 <br /> PW Plan Review $20.00 CIT <br /> PW Site Inspection $20.00 Perm <br /> Vie E vE <br /> Stormwater System Development Fee $55.29 rmat Servi CL�RsET'T <br /> City of Everett Official Use Only ACKNOWLEDGEMEIVTSF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> PO& Eeltritagid 1/05/2022 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> APPLICANT/JOB SITE COPY TREASURER ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.