Laserfiche WebLink
Figure 1-3.1: Flow Chart for Determining Requirements for New <br /> Development <br /> Start Here <br /> IL <br /> See Redevelopment Project <br /> Does the Site have 35% Yes Thresholds and the Figure "Flow <br /> or more of existing hard ► Chart for Determining <br /> surface coverage? Requirements for Redevelopment". <br /> (No) <br /> Does the Project convert% <br /> v acres or more of vegetation to <br /> Does the Project result in lawn or landscaped areas, or <br /> 5,000 square feet,or C141- convert 2.5 acres or more of <br /> greater,of new plus ► native vegetation to pasture? <br /> replaced hard surface <br /> area? <br /> Nod <br /> /es <br /> Yes Does the Project result in 2,000 <br /> v square feet,or greater,of new plus <br /> All Minimum Requirements replaced hard surface area? <br /> apply to the new and replaced <br /> hard surfaces and converted CD No <br /> vegetation areas. <br /> lir <br /> Y Y Y Does the Project have land <br /> Minimum Requirements#1 disturbing activities of 7,000 <br /> through#5 apply to the new es square feet or greater? <br /> and replaced hard surfaces <br /> and the land disturbed. No <br /> v <br /> Minimum Requirement#2 <br /> applies. <br /> lialli <br /> ft'' Flow Chart for Determining Requirements for <br /> °WWI New Development <br /> DEPARTMENT O F Revised March 2019 <br /> ECOLOGY Please see httpi/ ww.ecy.wa.gov/copyright htm/for copyright notice includin <br /> g permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> 2019. Stormwater Management Manual for Western Washington <br /> Volume I-Chapter 3-Page 89 <br />