• � I COBALT <br /> GEOTECHNICAL INVESTIGATION <br /> GEOSCIENCES <br /> EVERETT,WASHINGTON <br /> December 24, 2019 <br /> 4.5 feet or more. Pin piles may be used to limit the need to overexcavate fill materials. We can provide <br /> design information for pin piles upon request. <br /> Infiltration of stormwater runoff is not feasible at this site. The property is underlain by dense to very <br /> dense glacial till which is nearly impermeable and acts as a restrictive layer. We recommend direct <br /> connection of new runoff collection devices to City stormwater infrastructure. <br /> 8.o Recommendations <br /> 8.1.i Site Preparation <br /> Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic-rich soil and <br /> fill. Based on observations from the site investigation program, it is anticipated that the stripping depth <br /> will be 6 to 12 inches. Deeper excavations will be necessary below large trees, existing foundation areas, <br /> and in any areas underlain by undocumented fill materials. <br /> The native soils consist of silty-sand with gravel. These soils may be used as structural fill provided they <br /> achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils <br /> may only be suitable for use as fill during the summer months, as they will be above the optimum <br /> moisture levels in their current state. These soils are variably moisture sensitive and may degrade during <br /> periods of wet weather and under equipment traffic. <br /> Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches <br /> and less than 5 percent fines(material passing the U.S. Standard No.200 Sieve). Structural fill should be <br /> placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of <br /> the modified proctor maximum dry density,as determined by the ASTM D 1557 test method. <br /> 8.1.2 Temporary Excavations <br /> Based on our understanding of the project, we anticipate that the grading could include local cuts on the <br /> order of approximately 4 feet or less for foundation and utility placement.Any deeper excavations should <br /> be sloped no steeper than 1.5H:1V in loose soils, iH:iV in medium dense native soils and 3/4H:1V in <br /> dense to very dense native soils. If an excavation is subject to heavy vibration or surcharge loads, we <br /> recommend that the excavations be sloped no steeper than 2H:1V,where room permits. <br /> Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, <br /> Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified <br /> person during construction activities and the inspections should be documented in daily reports. The <br /> contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br /> erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather,and the <br /> slopes should.be closely monitored until the permanent retaining systems or slope configurations are <br /> complete. Materials should not be stored or equipment operated within 1 o feet of the top of any <br /> temporary cut slope. <br /> 4 <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> cobaltgeoagmail.com <br /> 206-33i-1097 <br />