My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
423 ROCKEFELLER AVE 2023-05-31
>
Address Records
>
ROCKEFELLER AVE
>
423
>
423 ROCKEFELLER AVE 2023-05-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 11:21:21 AM
Creation date
5/31/2023 11:19:14 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
423
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COBALT <br /> GEOTECHNICAL INVESTIGATION <br /> GEOSCIENCES <br /> EVERETT,WASHINGTON <br /> December 24,2019 <br /> 1.o Introduction <br /> In accordance with your authorization, Cobalt Geosciences, LLC (Cobalt) has completed a geotechnical <br /> investigation for the proposed residential development located along the east side of Rockefeller Avenue <br /> north of 5th Street in Everett,Washington(Figure 1). <br /> The purpose of the geotechnical investigation was to identify subsurface conditions and to provide <br /> geotechnical recommendations for foundation design, stormwater management, earthwork, soil <br /> compaction,and suitability of the on-site soils for use as fill. <br /> The scope of work for the geotechnical evaluation consisted of a site investigation followed by engineering <br /> analyses to prepare this report. Recommendations presented herein pertain to various geotechnical <br /> aspects of the proposed development, including foundation support of the new buildings and new <br /> pavements. <br /> 2.o Project Description <br /> The project includes construction of six new single-family residences, utilities, roadways/driveways, and <br /> stormwater infrastructure. <br /> Anticipated building loads are expected to be light to moderate and site grading will include cuts and fills <br /> on the order of 4 feet or less. Stormwater management will include infiltration devices, if feasible. We <br /> should be provided with the final plans when they become available. <br /> 3.o Site Description <br /> The site is located at northeast of the intersection of 5th Street and Rockefeller Avenue in Everett, <br /> Washington (Figure 1). The property consists of six rectangular parcels located between Rockefeller <br /> Avenue and Legion Golf Course. <br /> The property is undeveloped and vegetated with grasses. The site is nearly level to slightly sloping in <br /> several directions. There is evidence of fill throughout the site. <br /> The site is bordered to the north by residential properties, to the east and south by a golf course, and to <br /> the west by Rockefeller Avenue. <br /> 4.o Field Investigation <br /> 4.1.i Site Investigation Program <br /> The geotechnical field investigation program 'was completed on December io, 2019 and included <br /> excavating and sampling five test pits within the property for subsurface analysis. <br /> The soils encountered were logged in the field and are described in accordance with the Unified Soil <br /> Classification System(USCS). <br /> 1 <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> cobaltgeoagmail.com <br /> 206-331-1097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.