• <br /> Lighting, Motor, and Electrical Permit Checklist, Pg. 5 LTG-CHK <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings induding R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> Sea Mar Everett Clinic Date 4/8/2020 <br /> The following information is necessary to check a permit application for compliance with the lighting,motor,and electrical requirements in the <br /> Applicability Location in Building Department <br /> (yes,no,na) Code Section Component Compliance information required in permit documents _ Documents Notes <br /> MOTORS,TRANSFORMERS,ELECTRIC METERS,INTERIOR TRANSPORTATION <br /> NA C405.6 Electrical Include electrical transformer schedule on electrical plans; <br /> transformers indicate transformer size,efficiency,or exception taken <br /> Dwelling unit Indicate on electrical plans that each dwelling unit in Group R-2 <br /> NA C405.7 electrical energy has a separate electrical energy meter <br /> consumption <br /> Electric motor Include all motors,including fractional hp motors,in electric <br /> NA C405.8 efficiency motor schedule on electrical plans;indicate hp,rpm,rated <br /> efficiency,or exception applied <br /> For luminaires in each elevator cab,provide calculated average <br /> efficacy of combined fixtures that indicates efficacy is not less <br /> than 35 lumens per watt; <br /> NA C405.9.I Elevator cabs Indicate rated watts per cfm for elevator cab ventilation fans do <br /> not exceed 0.33 watts per cfm; <br /> Indicate automatic controls that de-energize lighting and <br /> ventilation fans when elevator is stopped and unoccupied for a <br /> period of 15 minutes or more <br /> Escalators and Indicate escalators comply with ASME A17.1/CSA B44; <br /> NA C405.9.2 moving walks automatic controls are configured to reduce operational speed tc <br /> the minimum permitted when not in use <br /> NA C405.9.3 Regenerative drive Indicate all one-way down or reversible escalators are provided <br /> with a variable frequency regenerative drive <br /> DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING(Cx) <br /> Indicate that all electrical systems(receptacles,transformers, <br /> motors,vertical and horizontal transportation)for which the <br /> WSEC requires control functions and/or configuration to <br /> Scope of electrical perform specific functions are required to be commissioned; <br /> No C408.3 power and lighting - <br /> systems Where total building lighting load is>20 kW,or where total <br /> commissioning lighting load of luminaires requiring daylight sensing and/or <br /> occupancy control>10 kW,indicate that all automatic lighting <br /> control systems are required to be commissioned;or provide <br /> building lighting power calculation demonstrating eligibility for <br /> exception; <br /> Indicate Cx requirements in plans and specifications for all <br /> applicable electrical and lighting control systems per C408; <br /> Include general summary with at minimum Items 1 thru 4 of the <br /> C405.13 Commissioning Cx plan per C408.1.2 including:narrative description of <br /> C408.1.1 requirements in activities,responsibilities of the Cx team,schedule of activities <br /> No C408.1.2 construction including verification of project dose out documentation per <br /> C408.1.4.2 documents C103.6,and conflict of interest plan(if required); <br /> C103.6 -- -- <br /> Include in general summary that a Cx project report or <br /> Compliance Checklist(Figure C408.1.4.2)shall be completed <br /> by the Certified Cx Professional and provided to the owner prior <br /> to the final electrical inspection <br /> Functional Identify in plans and specifications the intended operation of all <br /> Yes C408.3.1 performance testing equipment and controls during all modes of operation,including A2.07 <br /> criteria interfacing between new and existing-to-remain systems <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> Indicate in plans that project dose out documentation is <br /> Project close out required including WSEC lighting compliance forms and <br /> Yes C103.6.3 documentation calculations that document all interior and exterior lighting area A2.07 <br /> requirements and/or surface types,lighting power allowances and installed <br /> densities <br /> if"no"is selected for any question,provide explanation: <br /> *Existing Exterior Lights: No Change. <br /> *Existing Interior Lights: No Change. <br /> *Commissioning not required if total installed lighting load is less than 20kW(C408.3 Electrical power and lighting systems <br /> commisisioning) <br /> *Controlled Receptacles are no <br />