My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/05/31 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/05/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 10:35:54 AM
Creation date
5/31/2023 5:30:56 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/31/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C3. Does the plan include goals to reduce/avoid long-term vulnerabilities to the identified <br />hazards? (Requirement 44 CFR § 201.6(c)(3)(i)) <br />C3-a. Does the plan include goals to reduce the risk from the hazards identified in the plan? <br />C4. Does the plan identify and analyze a comprehensive range of specific mitigation actions and <br />projects for each jurisdiction being considered to reduce the effects of hazards, with emphasis <br />on new and existing buildings and infrastructure? (Requirement 44 CFR § 201.6(c)(3)(ii)) <br />C4-a. Does the plan include an analysis of a comprehensive range of actions/projects that each <br />jurisdiction considered to reduce the impacts of hazards identified in the risk assessment? <br />C4-b. Does the plan include one or more action(s) per jurisdiction for each of the hazards as <br />identified within the plan's risk assessment? <br />C5. Does the plan contain an action plan that describes how the actions identified will be <br />prioritized (including a cost -benefit review), implemented, and administered by each <br />jurisdiction? (Requirement 44 CFR § 201.6(c)(3)(iv)); (Requirement §201.6(c)(3)(iii)) <br />C5-a. Does the plan describe the criteria used for prioritizing actions? <br />C5-b. Does the plan provide the position, office, department or agency responsible for <br />implementing/administrating the identified mitigation actions, as well as potential funding <br />sources and expected time frame? <br />ELEMENT C REQUIRED REVISIONS <br />Required Revision: <br />Element D: Plan Maintenance <br />Element D Requirements Location in Plan <br />(section and/or page number) Met / Not Met <br />D1. Is there discussion of how each community will continue public participation in the plan <br />maintenance process? (Requirement 44 CFR § 201.6(c)(4)(iii)) <br />D1-a. Does the plan describe how communities will continue to seek future public participation <br />after the plan has been approved? <br />D2. Is there a description of the method and schedule for keeping the plan current (monitoring, <br />evaluating, and updating the mitigation plan within a five-year cycle)? (Requirement 44 CFR § <br />201.6(c)(4)(i)) <br />D2-a. Does the plan describe the process that will be followed to track the progress/status of <br />the mitigation actions identified within the Mitigation Strategy, along with when this process <br />will occur and who will be responsible for the process? <br />Page 16 <br />(Form Approved by City Attorney's Office November 1, 2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.