Laserfiche WebLink
RESIDENTIAL PHOTOVOLTAIC PERMIT APPLICATION (Page 2at2) <br />CITY OF EVERETT PERMIT SERVICES <br />3200 CEDAR STREET, EVERETT, WA 98201 <br />(P)425-257-MlO I FAX425-257-8857 wisw.evereffivegov/permits <br />ELECTRICAL PERMIT CHECKLIST <br />DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER ELECTRICAL PERMIT: <br />tl you answer es to all of the below questions, the protect qualifies for an over-the-counter electrical permit. <br />YES <br />NO <br />1. PV modules, Inverters, and combiner boxes are identified for use In PV systems. <br />EZ <br />❑ <br />2. The inverters are listed and Iaveled in accordance with ILL 1741 and are listed for mlily interaction. IIRC M2302.4] <br />❑ <br />3. The AC interconnection point is on the bad aide of service disconnect. [NEC 690.64(15)] <br />❑ <br />4. The system meats all current NEC, City, and Washington Cities Electrical Code requirements. <br />Pr <br />❑ <br />5. For Split -Buss; Modules the AC interconnection must be one of the six service disconnects. <br />❑ <br />6. Maximum load added to the panel board is vased on the rating of the panelboards bus/main OCPD combination In accordance <br />with NEC 705.12(D)(2)(3)(b), and is limited b (check the combination below that applies) : <br />❑ 225amp busl200amp main 0CPD-13,40OAC watts, max. 70amp inverter OCPD. <br />❑225amp busl225amp main OCPD-8,640AC watts, max. 45amp inverter OCPD. <br />❑a/200amp bus/200amp main OCPD-7,860AC watts. max. 40amp inverter OCPD. <br />❑ 150amp buell50amp main OCPD-5,760AC watts, max. 30amp inverter OCPD. <br />❑ 125amp bull25amp main OCPD4,800AC watts, max. 25amp inverter OCPD. <br />❑ 125amp bull00amp main OCPD-9,600AC watts, max. 50amp inverter OCPD. <br />❑ 100amp bus/100amp mein OCPD-3,840AC watts, max. 20amp inverter OCPD. <br />❑ Other Electrical Permit with Plan Review Required: <br />NOW 1: Urea un-anerea cal malrv0aa combination. N[eral or me panemoam main uuvu win require plan <br />nivipw <br />Note 2: The circuit conductors and overcurrent devices shall be s¢ed to cany not less than 125 percent of the <br />maximum currents as calculated in 690.8(A). The rating or setting of ovemurrent devices shall be permitted in <br />accordance with 240 4(B) and (C). [NEC 690.8(B)(1)] <br />NOW 3: If a panelboard employs a snap switch rated 30 amperes or lass in any branch circuit, it cannot be rated more <br />then 200 amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelbo i d. <br />This requirement does not apply to panelboards equipped with circuit breakers. Section 408.36(a) of the NEC. <br />7. 1 have attached Me following Electrical One -Line Diagram: <br />❑Standard Electrical Diagram -6 Strings or Less <br />-/ <br />LYl Standard Electrical Diagram -4 Strings or Less <br />❑ Standard Electrical Diagram -Micro Inverter <br />❑ None of the above - Electrical Permit with Plan Review Required <br />PLEASEFILL OUTA CITYOF EVERETT ELECTRICAL PERWAPPLMAMN IF YOU QUALIFY FOR AN OTC ELECTRICAL PERMIT. <br />AGREEMENT: I hereby certify that I have mad and examined this application and know he same to be true and conect. All provisions of laws <br />and ordinances goveming this type of work will be completed whether specified herein or not. The granting of a perm: does not presume to give <br />authority to violate or cancel he provisions of any other state or local law regulating construction or he perbmlance of construction. That I am <br />authorized by the owner of this property to perform the work for which application is made and I comply wilh Me Suite Contractors taw 18.27 <br />RCW and 296200 WAC. <br />cq &Evwm OKmvel use OMy <br />AsaOCIATEb ELECTRICAL PERMR 0 <br />QaseYc F¢NvQ2 0911412022 E <br />w WIAUmo:OAgent algnature bale (Revised AG04?016) <br />