Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />Amendment No. 1 - No Cost, Time Extension Only. <br /> <br />Amendment No. 2 - The purpose of Amendment No.2 was to extend the time of completion of <br />schematic design and modify the scope of work. The additional scope of work items included a <br />Project Labor Agreement analysis, project support for the General Contractor/Construction <br />Manager (GC/CM) alternative project delivery process, revisions to the schematic design, and a <br />move plan for the Police units located on the 7th Floor to relocate to a different floor during a <br />phase of construction. <br /> <br /> Amendment No. 3 - Design Services: <br /> <br />Base Services: <br />Design Development $506,400 <br />Construction Documents $452,000 <br />Subtotal Fixed Fee $958,400 <br /> <br />Permitting (2200235.04) $ 52,110 <br />Bid Assistance (2200235.05) $ 48,254 <br />Construction Contract Administration (2200235.06) $511,742 <br />Subtotal Hourly Rate with estimate for (.04/.05/.06) $612,106 <br /> <br />Additional Services <br />Furniture, Fixtures, and Equipment Design (Hourly) $120,797 <br />Signage and Wayfinding (Fixed) $ 50,818 <br />Acoustic Design Services (Fixed) $ 26,544 <br />Cost Estimate & Reconciliation (During const. Docs) $ 17,540 <br />Subtotal Combination of Fixed & Hourly $215,699 <br /> <br />Subtotals $1,786,205 <br />Design Contingency $450,000 <br />Reimbursables expenses $ 20,000 <br />TOTAL $2,256,205 <br /> <br /> <br />DESIGN CONTINGENCY <br />Additional Services that may be needed based upon issues that surface during the design and <br />construction of the project as approved Only In Writing and signed by the authorized City <br />representative. <br /> <br /> <br /> <br /> <br /> <br /> <br />