Laserfiche WebLink
City of Everett 00 6363 - 4 <br />Inductive Charging Infrastructure for Everett Transit <br />Exhibit A —Description of Changed Work <br />At the time the inductive charger infrastructure was designed. Momentum Dynamic (inductive <br />charger manufacturer) and Gillig (bus manufacturer) had not finalized the design specification for <br />the receiving pads on the bus. Everett Transit did not have civil engineering conduct on this <br />project until the design was finalized. Working with City engineers it was determined the best <br />practice was to follow WSDOT Dowel Bar Retrofit for Cement Concrete Pavement Standard Plan <br />A-60.20-03. Change Order No. 2 is the cost to complete the added specifications. <br />END OF SECTION 00 6363 <br />00 6363 - 4 CHANGE ORDER - AGREED <br />