My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 2/9/2023 Change Order 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Brink Electrical Inc. 2/9/2023 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:39:36 PM
Creation date
6/9/2023 2:39:22 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
2/9/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003429
Total Compensation
$42,240.34
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Brink Electrical Inc. 7/19/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 6363 - 4 <br />Inductive Charging Infrastructure for Everett Transit <br />Exhibit A —Description of Changed Work <br />At the time the inductive charger infrastructure was designed. Momentum Dynamic (inductive <br />charger manufacturer) and Gillig (bus manufacturer) had not finalized the design specification for <br />the receiving pads on the bus. Everett Transit did not have civil engineering conduct on this <br />project until the design was finalized. Working with City engineers it was determined the best <br />practice was to follow WSDOT Dowel Bar Retrofit for Cement Concrete Pavement Standard Plan <br />A-60.20-03. Change Order No. 2 is the cost to complete the added specifications. <br />END OF SECTION 00 6363 <br />00 6363 - 4 CHANGE ORDER - AGREED <br />
The URL can be used to link to this page
Your browser does not support the video tag.