My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garner's Northwest Inc. 1/11/2023 Change Order 3
>
Contracts
>
Small Works Roster Contracts and Change Orders
>
Small Works Roster Contracts and Change Orders
>
Garner's Northwest Inc. 1/11/2023 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:22:43 PM
Creation date
6/9/2023 3:22:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Garner's Northwest Inc.
Approval Date
1/11/2023
Department
Procurement
Department Project Manager
Jenny Chang/Lolly Huggins
Subject / Project Title
Madison Morgan - Park Trail Improvements
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0003477
Total Compensation
$105,377.90
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Garner's Northwest Inc. 9/19/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Small Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CHANGE ORDER # <br /> <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ #2022-066 Madison Morgan – Park Trail Improvements <br />Description of Change: <br />BUILDING/LOCATION: Madison Morgan Park, 518 Madison Street, Everett, WA 98203 <br />The monument sign base has been revised from a 6” thick concrete base to a 9” thick concrete base. This change order <br />covers the additional cost of framing material and concrete. <br />The original drawings specified that the monument sign required a 6” thick concrete base. The contractor indicated that <br />the work for the monument sign base was to begin, and the project manager informed Permit Services and provided the <br />proposed drawing. Upon inspection of the drawing by Permit Services, Permit Services requested that the base be <br />increased from 6” thick to 9” thick to comply with city signage standards. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $104,944.89 Contract Time & Completion Date Prior <br />to This Change 120 <br />Completion <br />Date Prior <br />01/23/23 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change+ +$433.01 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change $105,377.90 Contract Time & Completion Date <br />Including This Change 120 <br />Completion <br />Date After <br />01/23/23 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in the above “Description of Change” and that the compensation shown above represents complete <br />compensation for all such changes, including all direct and indirect costs and impacts. The City of Everett and the <br />Contractor further agree that Contract time shall be adjusted to the extent shown above. This Change Order only <br />changes the contract between City of Everett and the Contractor to the extent explicitly provided in this Change Order. <br />Signatures on this change order may be ink, scanned pdf signature, or other electronic means. <br />CONTRACTOR CITY OF EVERETT <br />Garner’s Northwest Landscaping <br />13807 250th Ave SE <br />Monroe, WA 98272 <br /> City of Everett <br />2930 Wetmore Avenue <br />Everett, WA 98201 Date <br /> <br />Project Manager: <br />Division Manager: <br /> <br /> Department Director: <br />Name & Title: <br /> City Attorney Template Approved as to Form 10.17.22 <br />Date: <br /> Mayor: <br /> <br />* WA Use Tax on materials included. WAC 458-20-171 <br /> <br /> <br /> <br /> <br />0003 <br />jeffrey <br />garner <br />Digitally signed by jeffrey garner <br />DN: cn=jeffrey garner, o, ou, <br />email=jeff@garnersnorthwest.co <br />m, c=US <br />Date: 2023.01.09 14:14:34 -08'00' <br />Lolly 01/09/2023 <br />01/09/2023 <br />01/09/2023 <br />Cassie Franklin 01/11/2023 <br />Attest:
The URL can be used to link to this page
Your browser does not support the video tag.