My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 3/28/2023 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Dept of Ecology 3/28/2023 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:58:29 AM
Creation date
6/13/2023 8:57:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
3/28/2023
Council Approval Date
3/1/2023
End Date
1/31/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Public Works WO Number
UP3745
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002332
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 17State of Washington Department of Ecology <br />City of Everett <br />Beverly Lake Water Quality Retrofit Project <br />Agreement No. WQC-2020-COE-00091 <br />Approved Indirect Costs Rate: <br />Recipient Match %: <br />InKind Interlocal Allowed: <br />InKind Other Allowed: <br />Is this Funding Distribution used to match a federal grant? <br />Approved State Indirect: 30% <br />25% <br />No <br />No <br />No <br />SFAP Task Total <br />Grant and Loan Administration $12,500.00 <br />Design Plans and Specs, Environmental Review $90,500.00 <br />Construction Management $25,000.00 <br />Construction $860,000.00 <br />Total: 988,000.00$ <br />CHANGES TO SCOPE OF WORK <br />Task Number:4 Task Cost: $860,000.00 <br />Task Title:Construction <br />Task Description: <br />A. The RECIPIENT will complete construction of the project in accordance with ECOLOGY -accepted plans and <br />specifications. The construction project will include installation of GULD-approved stormwater treatment devices to mitigate <br />runoff from approximately 50 acres of pollution generating impervious surfaces. <br />B. Calculate and submit an equivalent new/re-development area for the completed retrofit project(s) using the methods <br />outlined in the Stormwater Project Deliverables Guidance, Section D. <br />Task Goal Statement: <br />Construction of the project in accordance with ECOLOGY-accepted plans and specifications. <br />Task Expected Outcome: <br />Constructed project will provide water quality benefits including reductions in TSS . <br />Template Version 10/30/2015 <br />DocuSign Envelope ID: 3B1AA069-D7AC-4DF2-8DE6-1656DE1C2417
The URL can be used to link to this page
Your browser does not support the video tag.