My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NETServices USA LLC 4/11/2023 Change Order 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
NETServices USA LLC 4/11/2023 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 9:12:55 AM
Creation date
6/13/2023 9:12:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
NETServices USA LLC
Approval Date
4/11/2023
Council Approval Date
11/9/2022
End Date
4/16/2023
Department
Parks
Department Project Manager
Katherine Phillips
Subject / Project Title
Legion Golf Course Pole & Netting System Emergency Repairs
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003545
Total Compensation
$334,132.92
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
NETServices USA LLC 12/7/2022
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER # <br />Project (Procurement) Number: Emergency Procurement Project Title: <br />EM 22011 Legion Emergency Golf Net Replacement <br />Description of Change: (Attach contractor’s change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 147 Alverson Blvd, Everett WA 98201 <br />This change order encompasses a credit for repair of asphalt cart path and golf grounds damaged <br />by Contractor. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $344,149.54 Contract Time & Completion Date Prior <br />to This Change 125 <br />Completion <br />Date Prior <br />04/16/23 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change+ -$10,016.62 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change $334,132.92 Contract Time & Completion Date <br />Including This Change 125 <br />Completion <br />Date After <br />04/16/23 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described <br />in the above “Description of Change” and that the compensation shown above represents complete compensation for all <br />such changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree <br />that Contract time shall be adjusted to the extent shown above. This Change Order only changes the contract between <br />City of Everett and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order <br />may be ink, scanned pdf signature, or other electronic means. <br />CONTRACTOR CITY OF EVERETT <br />NETServices USA, LLC <br />13010 11th Ave NE <br />Tulalip, WA 98271-6751 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: Katherine Phillips 04/04/2023 <br />Division Manager: Ruben Sanchez <br />Department Director: Bob Leonard <br />Name & Title: City Attorney Template Approved as to Form 10.17.22 <br />Date: Mayor: Cassie Franklin <br />*WA Use Tax on materials included. WAC 458-20-171 <br />0002 <br />Dan Nunn - Managing Member <br />04/05/2023 <br />04/04/23 <br />04/04/23 <br />Cassie Franklin 04/11/2023
The URL can be used to link to this page
Your browser does not support the video tag.