My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1721 70TH PL SE 2023-06-14
>
Address Records
>
70TH PL SE
>
1721
>
1721 70TH PL SE 2023-06-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2023 11:30:15 AM
Creation date
6/14/2023 11:13:30 AM
Metadata
Fields
Template:
Address Document
Street Name
70TH PL SE
Street Number
1721
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AERIAL VIEW <br />D <br />O <br />O '4 <br />1 <br />�f <br />RESIDENCE PHOTO <br />SHALL NOT BE USED FOR THE BENEFITOFcc o <br />SOLGENPOWER <br />S O L G N <br />ANYONE OUTSIDE BOLDEN POWER.NEITHER <br />5100 ELM RD. <br />SHALL IT BE DISCLOSED TO OTHERS OUTSIDE <br />PASCO, WA 98301 <br />P 0 W E R <br />THE RECIPIENTS ORGANIZATION, EXCEPT IN <br />CONNECTION WITH THE SALE AND USE OF THE <br />P: 508-931-1663 <br />RESPECTIVE EQUIPMENT, WITHOUT WRITTEN <br />CONSENT FROM SOLGEN POWER. <br />ELECTRICAL NOTES <br />1. WHERE ALLTERMINALS OF THE <br />DISCONNECTING MEANS MAYBE <br />ENERGIZED IN THE OPEN POSITION, A <br />SIGN WILL BE PROVIDED WARNING OF <br />THE HAZARDS. (PER ART. 690.17) <br />2. EACH UNGROUNDED CONDUCTOR OF <br />THE MULTIWIRE BRANCH CIRCUIT WILL <br />BE IDENTIFIED BY PHASE AND SYSTEM. <br />(PER ART. 210.5) <br />3. A NATIONALLY RECOGNIZED TESTING <br />LABORATORY SHALL LIST ALL <br />EQUIPMENT IN COMPLIANCE WITH <br />ARTICLE 110.3. <br />4. ALL WIRES SHALL BE PROVIDED WITH <br />STRAIN RELIEF AT ALL ENTRY POINTS <br />INTO BOXES AS REQUIRED BY UL LISTING <br />5. MODULE FRAMES SHALL BE GROUNDED <br />AT THE UL-USTED LOCATION PROVIDED <br />BY THE MANUFACTURER USING <br />UL-LISTED GROUNDING HARDWARE. <br />6. MODULE FRAMES, RAIL, AND POSTS <br />SHALL BE BONDED WITH EQUIPMENT <br />GROUND CONDUCTORS AND GROUNDED <br />AT THE MAIN ELECTRICAL PANEL. <br />T. THE DC GROUNDING ELECTRODE <br />CONDUCTOR SHALL BE SIZED <br />ACCORDING TO ARTICLE 250.1668 8 <br />SWAT. <br />WA3o4,Qo <br />2 <br />2 11 2 <br />GIS <br />to AL Q <br />10/12/2021 <br />STRUCTURAL ONLY <br />PV 1 COVER PAGE <br />PV 2 SITE PLAN <br />PV 3 ELECTRICAL DIAGRAM <br />PV 4 CHIKO MOUNTING <br />GENERALNOTES <br />1. PRIOR TO THE COMMENCEMENT OF ANY <br />WORK, THE CONTRACTOR SHALL NOTIFY <br />THE DESIGNER OF ANY DISCREPANCIES <br />WITH THE DESIGN IN ANY CAPACITY. <br />ESPECIALLY RECOMMENDATIONS, CODES, <br />OR REGULATIONS 8 RULES OF THE <br />AUTHORITY HAVING JURISDICTION, WHICH <br />SUPERSEDED THE NEC. <br />2. ALL DIMENSIONS TO BE VERIFIED BY <br />CONTRACTOR PRIOR TO COMMENCEMENT <br />OF WORK. <br />3. CONTRACTOR IS RESPONSIBLE FOR ALL <br />SAFETY PRECAUTIONS, OSHA <br />REQUIREMENTS ETC. FOR THE SITE, <br />INCLUDING EXISTING SITE HAZARDS. <br />4. SYSTEM IS GRID INTERACTIVEIINTERTIED <br />VIA A ILL LISTED POWER -CONDITIONING <br />INVERTER. <br />5. SYSTEM HAS NO ENERGY STORAGE OF <br />ANY KIND, OR UPS. <br />6. ALL SOLAR MOUNTING FRAMEWORK TO <br />BE GROUNDED. <br />T. FOLLOW MANUFACTURERS SUGGESTED <br />INSTALLATION PRACTICES AND WIRING <br />SPECIFICATIONS. <br />8. ALL WORK TO BE IN COMPLIANCE WITH <br />THE INTERNATIONAL BUILDING CODES. <br />(IBC) <br />9. ALL ELECTRICAL WORK TO BE IN <br />COMPLIANCE WITH THE NATIONAL <br />ELECTRIC CODE (NEC). <br />SHEETINDEX <br />Russell Wilson <br />2T(&y Si [sill 21 It I Z rH 11 LLH:7_4T, <br />PV 6 PLACARD <br />CUT SHEETS ATTACHED <br />DIM" BY: <br />PLG <br />DATE: <br />09/10/2021 <br />1721 70th PI SE, Everett, WA 98203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.