Laserfiche WebLink
PUGET SOUND REGION <br />O <br />NO SCALE LOCATION MAP <br />NO <br />EVERETT SITE <br />SCALE VICINITY MAP <br />SITE <br />0.30 <br />40.31 <br />40.32 <br />40.33 <br />40.35 <br />40.36 <br />40.53 <br />40.21 <br />40.22 <br />40.23 <br />40.24 <br />40.25 <br />40.26 <br />40.51 <br />SYM I REVISION I BY I APPROVED <br />A 1767 VERTICAL PAINT BOOTH VENTILATION W55237821 FSi I KMC <br />40-051 767 VERTCAL PAaNT BOOTH ENT LAT ON — PHASE <br />BOENG COMMERICAL I`4E<„I-L=.IF'P_-..NES <br />DATE I SYM <br />06.18.2021 <br />UWNWfi k <br />BY I APPROVED I DATE <br />I B 1 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 W5523782 I FSi I KMC 106.27.20221 1 1 1 1 1 <br />SCOPE OF WORK <br />40-51 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2, #W5523782 <br />SUMMARY <br />THE PROJECT WILL ADDRESS THE RECURRING HEATING ISSUES WITHIN THE 767 VERTICAL PAINT <br />BOOTH'S (BOOTH #1) PROCESS VENTILATION SYSTEM. <br />COORDINATION WITH PRODUCTION IS NECESSARY TO ACCOMPLISH THE REQUIRED WORK. THIS <br />PROJECT WILL BE COMPLETED IN CONCURRENCE WITH SEMI -CONTINUOUS OPERATION AND THUS <br />THE BOOTH WILL NEED TO MAINTAIN OPERATIONAL STATUS WHEN USED BY PRODUCTION. <br />THE 40-51 FACILITY HAS BEEN USED FOR DECADES TO SPRAY HEAVY METAL PRIMER. PERSONAL <br />PROTECTIVE EQUIPMENT AND PROCEDURES MUST BE USED TO LIMIT EXPOSURES WITHIN APPROVED <br />LEVELS. THOROUGH SAFETY REVIEWS AND ESTABLISHED PROTECTIVE METHODS MUST BE <br />IMPLEMENTED PRIOR TO START OF WORK. <br />MECHANICAL SCOPE OF WORK <br />REMOVAL OF HEAT WHEELS FROM HEAT RECOVERY UNITS: <br />THE HEAT RECOVERY WHEELS IN EXISTING HEAT RECOVERY UNITS (HRU) HRU-1 AND HRU-2 WILL <br />BE REMOVED AND THE UNITS WILL BE BLANKED OFF TO SEPARATE THE SUPPLY AND EXHAUST AIR <br />STREAMS. THE STEAM HEATING COIL (HC-1) WILL ALSO BE REMOVED FROM BOTH HRU-1 AND <br />HRU-2, TO INCLUDE ADDITIONAL CAPACITY LOST THROUGH REMOVING THE HEAT RECOVERY WHEELS. <br />NEW CONDENSATE PIPE ROUTING: <br />NEW CONDENSATE PIPE ROUTING WILL BE PROVIDED FROM HC-1 AT BOTH HRU-1 AND HRU-2. <br />THE PATH OF THIS NEW PIPING WILL CONTINUE TO THE MEZZANINE, WHERE THE STEAM TRAPS AND <br />OTHER PIPE ACCESSORIES WILL BE INSTALLED, BEFORE CONNECTING TO AN EXISTING MAIN. AN <br />EXTENSION OF THE EXISTING CATWALK WILL BE CREATED FOR MAINTENANCE ACCESS TO THE STEAM <br />TRAPS AND ACCESSORIES. <br />NEW PIPE SUPPORTS: <br />PIPE SUPPORTS WILL BE ADDED AS PART OF THE NEW CONDENSATE ROUTING, INCLUDING PIPE <br />GUIDES, ANCHORS, AND SPRING HANGERS. NEW PIPE GUIDES WILL ALSO BE INSTALLED ON THE <br />EXISTING CONDENSATE PIPING SYSTEM. <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />M. C Nq <br />LQ <br />329 Q <br />N / ST <br />FS61ONAL ERA\ <br />oe 27= <br />ICCIF LEGEND <br />ORIGINAL ISSUE ORIG <br />NOT YET ISSUED FOR CONSTRUCTION <br />DRAWING REVISION — A <br />0 NOT IN THIS RELEASE SEE SPECIFIC DRAWING <br />FOR NATURE OF REVISION <br />• IN THIS ISSUE <br />INDEX OF DRAWINGS <br />MAYRNG NMM I OHM NC DRAIIYNY TITLE IPEV. DATE <br />Y MAL <br />• 40-051—GO GO COVER SHEEP — DRAWING INDEX B 06.27.2022 <br />STR11DTUUL <br />• 40-051-3S11 3S11 PARTIAL THIRD FLOOR PLAN B 06.27.20226.2 • 40-051—S437 S437 STEEL DETAILS RIG 07.2022 <br />• 40-051—S547 S547 STEEL DETAILS DRIG 06.27.2022 <br />• 40-051—S54 S548 STEEL DETAILS RIG 06.27.2022 <br />NECIMIMICAL <br />• 40-051—MlAR M1AR EQUIPMENT SCHEDULE — REMOVAL E 08.27.2022 <br />• 40-051—M3R M3R HVAC AIR FLOW DIAGRAM VERTICAL PAINT BOOTH — REMOVAL A 06.27.2022 <br />• 40-051—&R M4R FLOW DESIGN STEAM & CONDENSATE — REMOVAL B 06.27.2022 <br />• 40—O51-4M11R 4M11R FOURTH FLOOR DUCTWORK PLAN — REMOVAL D 06.27.2022 <br />• 40-051—M31OR M31OR VERTICAL PAINT BOOTH CONTROL DIAGRAM — REMOVAL B 06.27.2022 <br />• 40-051—M31 OAR M310AR VERTICAL PAINT BOOTH SYST. GUIDEUNES & SPECS. — REMOVAL B 06.27.2022 <br />• 40-051—M50OR M50OR MECHANICAL SECTIONS — REMOVAL D 06.27.2022 <br />• 40-051—M501R M501R MECHANICAL SECTIONS — REMOVAL D 06.27.2022 <br />• 40-051—M507R M507R PIPING SECTIONS AND DETAILS — REMOVAL D 06.27.2022 <br />• 40-051—M508R M50SR PIPING SECTIONS AND DETAILS — REMOVAL B 06.27.2022 <br />• 40-051—MIA M1A EQUIPMENT SCHEDULE E 06.27.2022 <br />• 40-051—M3 M3 HVAC AIR FLOW DIAGRAM VERTICAL PAINT BOOTH A 06.27.2022 <br />• 40-051—M4 M4 IFLOW DESIGN STEAM & CONDENSATE B 06.27.2022 <br />• 40-051—M1M61 M1 M61 HVAC PIPING MEZZANINE PLAN F 06.27.2022 <br />• 40-051-3M61 3M61 HVAC PIPING THIRD FLOOR B 06.27.2022 <br />• 40-051-4M11 4M11 FOURTH FLOOR DUCTWORK PLAN C 06.27.2022 <br />• 40-051—TM61 TM61 HVAC PIPING TRUSS FLOOR PLAN C 06.27.2022 <br />• 40-051—M310 M310 VERTICAL PAINT BOOTH CONTROL DIAGRAM B 06.27.2022 <br />• 40-051—M310a M310a VERTICAL PAINT BOOTH SYST. GUIDELINES & SPECS. B 06.27.2022 <br />• 40-051—M31 Ob M310b VERTICAL PAINT BOOTH SYST. GUIDELINES & SPECS. RIG 06.27.2022 <br />• 40-051—M310-1 M310-1 VERTICAL PAINT BOOTH CONTROL DIAGRAM RIG 06.27.2022 <br />• 40-051—M317 M317 PIPING & INSTRUMENTATION DIAGRAM P&ID B 06.27.2022 <br />• 40-051—M500 M500 IMECRANICAL SECTIONS C 06.27.2022 <br />• 40-051—M501 M501 MECHANICAL SECTIONS C 06.27.2022 <br />• 40-051—M507 M507 PIPING SECTIONS AND DETAILS D 06.27.2022 <br />• 40-051—M508 M508 PIPING SECTIONS AND DETAILS B 06.27.2022 <br />• 40-051—M1B M1B EQUIP. SCHEDULE EXHAUST FANS — FOR REFERENCE ONLY H 12.11.13 <br />• 40-051—M1C M1C HVAC LEGEND — FOR REFERENCE ONLY A 12.11.13 <br />• 40-051—MID M1D PIPING LEGEND — FOR REFERENCE ONLY D 10.14.16 <br />• 40-051—MlE M1E INSTRUMENT. LEGEND & ABBREV. — FOR REFERENCE ONLY A 12.11.13 <br />• 40-051—MlF M1F EQUIPMENT SCHEDULE SUPPLY FANS — FOR REFERENCE ONLY C 12.15.98 <br />• 40-051—MIN MIN EQUIPMENT SCHEDULE — FOR REFERENCE ONLY 1014.16 <br />• 40-051—M316 M316 PIPING & INSTRUMENTATION DIAGRAM P&ID A 07:22.96 <br />NOTE: ALL DRAWINGS NOT PLOTTED TO PERFECT <br />SCALE, CLOSE BUT NOT PERFECT. TOOLING DRAWINGS <br />PLOTTED AT 1 /2 SIZE. <br />ENGINEERS <br />Seattle H Spokane H Baltimore <br />ACCEPTABILITY LMS <br />THIS DESIGN AND/OR CHEI <br />SPECIFICATION IS APPROVED <br />ENGI <br />APPROVED BY DEPT. I DATE LMS <br />SUBTITLE <br />GENERAL NOTES <br />1. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO <br />PROCEEDING WITH THE WORK. <br />SCOPE OF WORK (SUMMARY) <br />THE PROJECT WILL ADDRESS THE RECURRING HEATING ISSUES WITHIN THE <br />767 VERTICAL PAINT BOOTH'S (BOOTH #1) PROCESS VENTILATION SYSTEM. <br />CODE DATA <br />LOCATION EVERETT, WASHINGTON <br />CODE: UBC, 1988 ED. <br />CITY OF EVERETT, CURRENT BLDG. REGULATIONS <br />ZONING: M2 <br />SEISMIC: ZONE 3 <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />COVER SHEET - DRAWING INDEX <br />11.13.08 <br />TITLE 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />11.13.08 BUILDING 40-051 <br />JOB N0. <br />11.13.08 <br />DWG NO. <br />MECHANICAL MASTER EVERETT, WA <br />MLVINUIV OTMDUL <br />W5523782 B <br />GO <br />587060-01 <br />40-051-GO <br />06.27.2022 <br />NOTE: ALL DRAWINGS NOT PLOTTED TO PERFECT <br />SCALE, CLOSE BUT NOT PERFECT. TOOLING DRAWINGS <br />PLOTTED AT 1 /2 SIZE. <br />ENGINEERS <br />Seattle H Spokane H Baltimore <br />ACCEPTABILITY LMS <br />THIS DESIGN AND/OR CHEI <br />SPECIFICATION IS APPROVED <br />ENGI <br />APPROVED BY DEPT. I DATE LMS <br />SUBTITLE <br />GENERAL NOTES <br />1. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO <br />PROCEEDING WITH THE WORK. <br />SCOPE OF WORK (SUMMARY) <br />THE PROJECT WILL ADDRESS THE RECURRING HEATING ISSUES WITHIN THE <br />767 VERTICAL PAINT BOOTH'S (BOOTH #1) PROCESS VENTILATION SYSTEM. <br />CODE DATA <br />LOCATION EVERETT, WASHINGTON <br />CODE: UBC, 1988 ED. <br />CITY OF EVERETT, CURRENT BLDG. REGULATIONS <br />ZONING: M2 <br />SEISMIC: ZONE 3 <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />COVER SHEET - DRAWING INDEX <br />11.13.08 <br />TITLE 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />11.13.08 BUILDING 40-051 <br />JOB N0. <br />11.13.08 <br />DWG NO. <br />MECHANICAL MASTER EVERETT, WA <br />MLVINUIV OTMDUL <br />W5523782 B <br />GO <br />587060-01 <br />40-051-GO <br />06.27.2022 <br />