Laserfiche WebLink
FOR CONTINUATION SEE <br />SHEET 4M60 <br />Y—STRAINER <br />0-60 PSIG <br />T <br />RED TO SUIT <br />(TYP) <br />EL 173'-0" <br />£ EL 170'-0" LPS 1" Y—STRAINER <br />EL 168'-6" 4" P <br />€ FI 167'-0" 5 4" _ . M507R <br />DETAIL <br />NO SCALE <br />/ ������• S"alllllly�////L�Ilil!!r! 1f�iL!!R%� �! • • 'i <br />TOS <br />EL. 137' -1 " <br />3/4" VAC. BREAKER <br />JOHNSON NO. <br />VB8-76—BR—T—S—E <br />FOR CONTINUATION <br />SEE SHEET 4M60 <br />137'-6" LEVEL <br />3/4" <br />1 " CON <br />D ETA <br />NO SCALE <br />® 3" <br />3 <br />DETAIL <br />REMOVAL OVAL NOTES NO SCALE 4M1 1 R, M50 R M507R D 2" <br />REMOVE STEAM PIPING, INSULATION, FITTINGS, AND <br />SUPPORTS. <br />REMOVE HEATING COIL FROM HRU-1 AND HRU-2. <br />REMOVE STEAM TRAP, BYPASS VALVE PIPING, AND <br />COIL CONNECTION PIPING. <br />® <br />REMOVE <br />HUMIDIFIER <br />FROM HRU-1 AND HRU-2 <br />REMOVE <br />VALVE FROM <br />HRU-1 AND HRU-2. <br />© <br />REMOVE <br />VALVE FROM <br />HRU-2. <br />I <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />A <br />AS -BUILT J#964058-01 <br />CANADA <br />07.22.96 <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />C1 <br />767 VERTICAL PAINT BOOTH - ADDENDUM 1 W5523782 <br />FSi <br />KMC <br />07.07.2021 <br />D <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />SYM <br />REMOVAL <br />BY I APPROVED I DATE <br />pfKENGINEERS <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED Seattle H Spokane H Baltimore <br />REVISION AREAS ONLY AS INDICATED <br />DRAWN <br />C ACCEPTABILITY C. TOLLIVER <br />C� wq0 THIS DESIGN AND/OR CHECKED <br />SPECIFICATION IS APPROVED R.G. DEIHL <br />BOA,W" ® ,,� y ENGINEER <br />APPROVED BY DEPT. DATE S. STURGEON <br />CHECKED <br />329 e D.ROBY <br />�iST I I APPROVED <br />J.S HOPKINS <br />APPROVED <br />H.L. CROTZER <br />4M11R, M507RIM507R <br />2"LPS SEE DETAIL 4 <br />ON M508 FOR CONT <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />3/4" FOR NOZZLE <br />STEAM JACKF�LS <br />/4" <br />"x1" <br />°x1" <br />11 <br />0 <br />0 <br />HUMIDIFYING " " <br />SPRAY NOZZLES (TYP) <br />tql <br />DETAIL <br />NO SCALE <br />3" <br />STEAM <br />DRYER <br />II <br />SEE DETAIL 2 ABOVE <br />FOR CONTINUATION <br />FD <br />4M11R, M507RIM507 <br />SATE SUBTITLE CURRENT REVISION SYMBOL DATE <br />5 s2 PIPING SECTIONS AND DETAILS W5523782 D 06.27.2022 <br />8-7-92 SHEET <br />5-92 TITLE 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 M507R <br />8 19 92 9-11-92 BUILDING 40-051 10739501 <br />JOB N0. COMP N0. <br />9-11-92 MECHANICAL MASTER COL. EVERETT, WA DWG N0. 40-051-M507R <br />