Laserfiche WebLink
HEAT RECOVERY WHEEL SCHEDULE <br />EQUIPMENT <br />NUMBER <br />AREA <br />SERVED <br />DWG. <br />N0. <br />LOCATION <br />EXHAUST SIDE <br />SUPPLY SIDE <br />UNIT <br />EFF. <br />%RPM <br />( ) <br />WHEEL <br />SPEED <br />(MAX.( ) <br />WHEEL <br />SPEED <br />MIN. RPM <br />( ) <br />BHP <br />MOTOR <br />HP <br />* VAR. <br />FREQ <br />DRIVE <br />PURGE <br />VOLUME <br />(MAX. CFM) <br />BASIS OF <br />DESIGN <br />NOTES <br />TEMP (0 F) <br />CFM <br />UNIT <br />TEMP (0 F) <br />CFM <br />UNIT <br />REF. <br />EDB <br />LDB <br />CP,IN.W.G. <br />EDB <br />LDB <br />�P,IN WG <br />HRW-3 <br />VERTICAL PAINT <br />BOOTH #2 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-3 <br />65 <br />32 <br />60,000 <br />0.94 <br />21 <br />54 <br />60,000 <br />0.93 <br />75 <br />20 <br />1 4 <br />/ <br />NOTE 6 <br />3 4 <br />/ <br />YES <br />10000 <br />, <br />SEMCO <br />MODEL TE3-66 <br />1,2,3,4,5 <br />HRW-4 <br />VERTICAL PAINT <br />BOOTH #2 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-4 <br />65 <br />32 <br />60,000 <br />0.94 <br />21 <br />54 <br />60,000 <br />0.93 <br />75 <br />20 <br />1/4 <br />NOTE 6 <br />3/4 <br />YES <br />10,000 <br />SEMCO <br />MODEL TE3-66 <br />1,2,3,4,5 <br />* VARIABLE FREQUENCY DRIVE SUPPLIED BY HEAT RECOVERY WHEEL MANUFACTURER. <br />1) TEFC MOTOR LOCATED IN THE SUPPLY AIR SYSTEM. <br />2) ALUMINUM WHEEL CONSTRUCTION. <br />3) ACCESS DOOR LOCATIONS SHALL BE AS SHOWN ON DRAWINGS. ACCESS DOORS SHALL BE ADEQUATELY SIZED FOR MAINTENENCE OF ALL COMPONENTS. <br />4) ALL HEAT RECOVERY WHEEL MOTORS ARE 460V/3PH/60HZ, HIGH EFFICIENCY TYPE. <br />5) HEAT WHEEL CABINET SHALL BE PROVIDED BY HEAT WHEEL MANUFACTURER. CABINET SHALL CONTAIN FILTER BANK, STEAM PREHEAT COIL, HEAT RECOVERY WHEEL, <br />STEAM REHEAT COIL, SUPPY FANS, AND STEAM HUMIDIFIER AS SHOWN ON DRAWINGS. <br />6) VENDOR SHALL PROVIDE MAXIMUM AND MINIMUM BRAKE HORSEPOWER REQUIRED FOR HEAT RECOVERY WHEEL. <br />STEAM HEATING COIL SCHEDULE <br />EQUIPMENT <br />AREA <br />DWG. <br />LOCATION <br />TOTAL <br />COIL <br />REQ'D <br />HTG C . <br />AIR TEMP <br />(DEG. F) <br />MAX. <br />VEL <br />FACE <br />PRESS. <br />CAP. <br />MAX <br />APD <br />G <br />COIL SIZE <br />NO. <br />ROW <br />N 01 <br />MAX. <br />FINS <br />REF. MFG. <br />NO I.FS <br />R <br />HC-1 <br />VERTICAL PAINT <br />BOOTH #1 <br />4M10 <br />MECH EQUIP. <br />IN HRU-1 <br />60,000 <br />2,333,000 <br />29.0 65 <br />600 <br />96.9 <br />20 <br />2482 <br />0.09 <br />186" <br />78" <br />1 2 <br />/ <br />8 <br />AEROFIN HD <br />1 <br />HC-2 <br />VERTICAL PAINT <br />BOOTH #1 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-2 <br />60,000 <br />2,333,000 <br />29.0 65 <br />600 <br />96.9 <br />20 <br />2482 <br />0.09 <br />186" <br />78" <br />1 2 <br />/ <br />8 <br />AEROFIN HD <br />1 <br />V TI <br />OT # <br />IP. <br />H -3 <br />* <br />U <br />5JA0 1 G <br />HC-4 <br />VERTICAL NT <br />BOOTH #2 <br />4M10 <br />MECH EQR-P. 4M <br />INU <br />60,000 <br />1,270,000 <br />54.2 65 <br />730 <br />82.5 <br />20 <br />1350 <br />0.17 <br />186" <br />78" <br />1/2 <br />6 <br />51JA0601G <br />1 <br />PHC-1 <br />VERTICAL PAINT <br />BOOTH #1 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-1 <br />29,000 <br />584,200 <br />21 39 <br />680 <br />42.9 <br />20 <br />620 <br />0.34 <br />68 <br />116 <br />1/1 <br />6 <br />WING <br />VIFB, VF- <br />1 <br />PHC-2 <br />VERTICAL PAINT <br />BOOTH #1 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-2 <br />29 000 <br />584,200 <br />21 39 <br />680 <br />42.9 <br />20 <br />620 <br />0.34 <br />68" <br />116" <br />1 1 <br />/ <br />6 <br />WING <br />VIFB, VF-6 <br />1 <br />PHC-3 <br />VERTICAL PAINT <br />BOOTH #2 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-3 <br />29 000 <br />584,200 <br />21 39 <br />680 <br />42.9 <br />20 <br />620 <br />0.34 <br />68" <br />116" <br />1 1 <br />/ <br />6 <br />WING <br />VIFB, VF-6 <br />1,2 <br />PHC-4 <br />VERTICAL PAINT <br />BOOTH #2 <br />4M10 <br />MECH EQUIP. RM <br />IN HRU-4 <br />29 000 <br />584,200 <br />21 39 <br />680 <br />42.9 <br />20 <br />620 <br />0.34 <br />68" <br />116" <br />1 1 <br />/ <br />6 <br />WING <br />VIFB, VF-6 <br />1,2 <br />* REQUIRED HEATING COIL CAPACITIES <br />ARE BASED <br />ON <br />A 75% HEAT <br />RECOVERY WHEEL EFFICIENCY. <br />1) DESIGN CONDITIONS AND CAPACITIES <br />GIVEN ARE <br />FOR <br />ENTIRE COIL <br />BANK. <br />2 DURING 64,000 CFM OPERATION, ALL <br />AIR SHALL <br />BY-PASS <br />COIL. <br />MAXIMUM AIR PRESSURE DROP SHALL BE 0.72 IN. W.G. <br />STEAM HUMIDIFIER SCHEDULE <br />EQUIP. <br />NUMBER <br />AREA <br />SERVED <br />DWG. <br />NO. <br />UNIT SERVED/ <br />REF. AREA <br />LOAD <br />LBS/HOUR <br />STEAM <br />PRESS. <br />(PSIG) <br />TUBE <br />DUCT <br />SIZE <br />(IN.) <br />ACTUATOR <br />TYPE <br />BASIS OF <br />DESIGN <br />REMARKS/ <br />ACCESSORIES <br />SIZE <br />NO. <br />HU-3 <br />VERT. PAINT <br />BOOTH #2 <br />M501 a <br />HRU-3 / MECH. <br />EQUIP. ROOM <br />980 <br />20 <br />120" <br />4 <br />PNEUMATIC <br />DRI-STEEM <br />MODEL 8-70 <br />1,2,3,4,5 <br />HU-4 <br />VERT. PAINT <br />BOOTH #2 <br />M501 a <br />HRU-4 / MECH. <br />EQUIP. ROOM <br />980 <br />20 <br />120" <br />4 <br />PNEUMATIC <br />DRI-STEEM <br />MODEL 8-70 <br />1,2,3,4,5 <br />1) INVERTED BUCKET OR F & T STEAM TRAP (3/4" MIN.). <br />2) INLET STRAINER. <br />3) HUMIDIFIER DESIGN AND INSTALLATION TO COMPLY WITH SEISMIC DESIGN <br />REQUIREMENTS OF SEISMIC ZONE III. <br />4) INSULATED DISPERSION TUBE. <br />5) STEAM JACKETED CONTROL VALVE <br />Ara <br />AIR TERMINAL <br />SCHEDULE <br />EQUIPMENT <br />NUMBER <br />AREA <br />SERVED <br />DWG. <br />NO. <br />LOCATION <br />AIRFLOW CAPACITY LIMITS (CFM) <br />NOMINAL SIZE (IN) <br />NECK DIMENSIONS (IN) <br />MAX <br />NC <br />MAX TSP DROP <br />(IN WG) <br />MATERIAL <br />OBD <br />FINISH <br />BASIS OF DESIGN <br />REMARKS <br />REF. <br />MAXIMUM <br />MINIMUM <br />LENGTH <br />WIDTH <br />LENGTH <br />WIDTH <br />MANUFACTURER <br />MODEL <br />7SG-1 <br />SG - 17 <br />VERTICAL PAINT <br />BOOTH #1 <br />4M11 <br />4M13 <br />VERTICAL PAINT <br />BOOTH #1 <br />3,465 <br />3,465 <br />96 <br />24 <br />94 <br />22 <br />10 <br />0.01 <br />ALUMINUM <br />NO <br />WHITE <br />PRICE <br />152 <br />1 <br />1) PROVIDE WITH GRILLE WITH BLADE INDEXING TO LOCK BLADES IN POSITION FOLLOWING SYSTEM BALANCING. <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />pfKENGINEERS <br />Seattle H Spokane H Baltimore <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />® <br />BOE//VO <br />M Gy <br />�� of wAq� <br />1:s� <br />y <br />, p 9 x <br />s A <br />F S�ONEN \ <br />AL <br />°SM� <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />DRAWN <br />C. TOLLIVER <br />DATE <br />6.8.92 <br />SUBTITLE <br />EQUIPMENT SCHEDULE <br />CURRENT REVISION <br />W5523782 <br />SYMBOL <br />E <br />DATE <br />06.27.2022 <br />— <br />RECORD DWG. — LOCKWOOD GREENE <br />3.1.94 <br />E <br />767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />CHECKED <br />R.G. DEIHL <br />6.8.92 <br />SHEET <br />a <br />A <br />ADDED EF-42 922865 <br />S.ZAGYI <br />S.ZAGYI <br />4.24.97 <br />ENGINEER <br />K. STUCKWISH <br />8.19.92 <br />TITLE <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />BUILDING 40-51 <br />MECHANICAL MASTER 40-51 <br />APPROVED BY <br />DEPT. <br />DATE <br />B <br />CHG. RATING EF-42 922865 <br />S.ZAGYI <br />S.ZAGYI <br />6.27.97 <br />CHECKED <br />D. ROBY <br />8.19.92IST <br />Boa No. <br />94049.01 <br />COMPND. <br />0 0018746 <br />C <br />AS —BUILT SCHEDULE <br />S.ZAGYI <br />S.ZAGYI <br />11.20.97 <br />APPROVED <br />J.S. HOPSKNS <br />9.11.92 <br />D <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />APPROVED <br />9.11.92 <br />DWG No. 40-51-M1a <br />