Laserfiche WebLink
Tracey Griffin <br /> Sold: 01/29/22 <br /> A: Everett, WA <br /> P: (425) 876-8649 <br /> Plumbing: Keeping existing left drain position. Raise shower head a few inches (confirm with <br /> client at install). <br /> Electrical: N/A <br /> Construction: Remove tub/shower combo and replace with WIS. Block in for one 24" grab bar, <br /> centered along 60"W (will order the grab bar from PBC in the future, additional $100 added in <br /> C&A for blocking). <br /> Floors/walls/ceiling: No floor/wall or ceiling scarring should be present. <br /> Special Customer Request: Discuss placement of 9" shower locker to be right side wall. LuxStone <br /> to ceiling. Discussed raising shower head a few inches. Please confirm all details with client at <br /> install. Add blocking for grab bar (see construction notes above). <br />