Laserfiche WebLink
r <br /> City of Everett 00 7200 - 22 <br /> I <br /> Contractor will be notified in writing, identifying the reasons for such a determination. If the Owner's <br /> Representatives find the Work substantially complete,he or she will meet with the Contractor to(1) <br /> prepare a Punch List of incomplete items of Work; (2)define the division of responsibility between <br /> Owner and Contractor with respect to security,operation,maintenance,heat,utilities,insurance,and <br /> warranties;and(3)describe any other issues related to acceptance of the substantially completed Work. <br /> If the Owner's Representative is not an employee of the Owner,the Owner's Representative will write to <br /> the Owner upon reaching agreement with the Contractor,certifying that the Work is substantially <br /> complete,listing the items of incomplete Work,stating the date for completion of incomplete Work, <br /> defining the division of responsibilities,and setting forth any other terms related to acceptance.In such <br /> event,the Owner will review the Owner's Representative's certification that the Work is substantially <br /> complete. If the Owner concurs,the Owner will notify the Contractor in writing that the Work is <br /> accepted as substantially complete.Except for any portion(s)of Work specified for early completion or <br /> required by the Owner for early possession,Substantial Completion will not occur for any Work until the <br /> entire Project is ready for possession and use.The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work,set the date for their completion and repair,describe the <br /> division of responsibility between the Owner and Contractor,and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work <br /> during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner,however,shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings,as-builts,required reports I <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing.Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract.If the ' <br /> Owner's Representative finds materials,Equipment,or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract.The Owner shall make the final <br /> determination of acceptability and completion.For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety,and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, <br /> and I <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications,designs,or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 00 7200 - 22 GENERAL CONDITIONS <br />